ISTIANA 110015096, FAJRI (2020) PENGARUH KINERJA PELAKSANAAN PROYEK DENGAN SISTEM PEMBAYARAN BERDASARKAN TERMIN PADA PROYEK KONSTRUKSI BANGUNAN GEDUNG DI PROVINSI DIY. Other thesis, INSTITUT TEKNOLOGI NASIONAL yOGYAKARTA.
Text (BAB IV)
5. BAB IV.pdf Restricted to Registered users only Download (1MB) | Request a copy |
|
Text (BAB I)
BAB I.pdf Download (251kB) |
|
Text (BAB II)
BAB II.pdf Restricted to Registered users only Download (510kB) | Request a copy |
|
Text (BAB III)
BAB III.pdf Restricted to Registered users only Download (345kB) | Request a copy |
|
Text (JUDUL)
cover.pdf Download (715kB) |
|
Text (DAFTAR PUSTAKA)
DAFTAR PUSTAKA.pdf Restricted to Registered users only Download (316kB) | Request a copy |
|
Text (LAMPIRAN)
lampiranku.pdf Download (885kB) |
Official URL: https://itny.ac.id
Item Type: | Thesis (Other) |
---|---|
Uncontrolled Keywords: | PENGARUH KINERJA |
Subjects: | T Technology > TJ Mechanical engineering and machinery T Technology > TN Mining engineering. Metallurgy |
Divisions: | Fakultas Teknik Sipil dan Perencanaan > Teknik Sipil |
Depositing User: | Dwi Asih Widawati |
Date Deposited: | 14 Jul 2020 04:02 |
Last Modified: | 07 Oct 2022 01:54 |
URI: | https://repository.itny.ac.id/id/eprint/1049 |
Actions (login required)
View Item |