ANALISIS PERCEPATAN PROYEK MENGGUNAKAN METODE CRASHING DENGAN PENAMBAHAN TENAGA KERJA DAN SHIFT KERJA. (STUDI KASUS: PROYEK PEMBANGUNAN JEMBATAN DAMAI, KALIMANTAN TIMUR

HERBYANTO, CHANDRA WAHYU (2022) ANALISIS PERCEPATAN PROYEK MENGGUNAKAN METODE CRASHING DENGAN PENAMBAHAN TENAGA KERJA DAN SHIFT KERJA. (STUDI KASUS: PROYEK PEMBANGUNAN JEMBATAN DAMAI, KALIMANTAN TIMUR. Other thesis, Institut Teknologi Nasional Yogyakarta.

[img] Text (Cover)
cover chandra.pdf

Download (1MB)
[img] Text
Bab 1 SKRIPSI CHANDRA WH 9JUNI2022 (1)-13-17.pdf
Restricted to Registered users only

Download (321kB) | Request a copy
[img] Text (Bab 2)
Bab 2 SKRIPSI CHANDRA WH 9JUNI2022 (1)-18-34.pdf
Restricted to Registered users only

Download (662kB) | Request a copy
[img] Text (Bab 3)
Bab 3 SKRIPSI CHANDRA WH 9JUNI2022 (1)-35-37.pdf
Restricted to Registered users only

Download (267kB) | Request a copy
[img] Text (Bab 4)
Bab 4SKRIPSI CHANDRA WH 9JUNI2022 (1)-38-81 (1).pdf
Restricted to Registered users only

Download (1MB) | Request a copy
[img] Text (Bab 5)
Bab 5 SKRIPSI CHANDRA WH 9JUNI2022-82-83.pdf
Restricted to Registered users only

Download (191kB) | Request a copy
[img] Text (Daftar Pustaka)
daftar pustaka SKRIPSI CHANDRA WH 9JUNI2022 (1)-84-85.pdf

Download (190kB)
[img] Text (Lampiran)
lampiran SKRIPSI CHANDRA WH 9JUNI2022 (1)-86-92-copy-0.pdf
Restricted to Registered users only

Download (938kB) | Request a copy

Abstract

Pembangunan Jembatan Damai mengalami kendala faktor cuaca hujan deras yang mengakibatkan muka air sungai naik dan terjadi banjir pada bulan 1 Februari – 17 maret (46 Hari Idle time) pada saat pemancangan di tepi sungai sisi Damai Seberang. Dengan terjadinya idle time, selama 46 hari menyebabkan pembangunan Jembatan menjadi terlambat progresnya menjadi minus 25%. Keterlambatan ini memerlukan analisis percepatan waktu pelaksanaan sehingga bisa tercapai sesuai target awal. Penelitian ini menggunakan metode crashing yang merupakan metode percepatam proyek secara sistematis dan analitis dengan mempersingkat waktu proyek. Metode ini menggunakan Microsoft Project dengan opsi penambahan tenaga kerja dan sistem shift kerja. Dari hasil penelitian, didapat biaya proyek dalam kondisi sesudah crashing dengan alternatif penambahan Tenaga Kerja didapat sebesar Rp. 28.531.756.479,7 atau lebih murah 0,759 % dari biaya proyek pada kondisi normal dan durasi proyek 331 hari kerja atau lebih cepat 9,31% dari durasi normal, sedangkan total biaya proyek dalam kondisi sesudah crashing dengan alternatif menerapkan sistem shift kerja (shift 1, shift 2, shift 3, dan shift 4) didapat sebesar Rp. 29.010.266.686,3 atau lebih mahal 0,905 % dari biaya proyek pada kondisi normal dan durasi proyek 319 hari atau lebih cepat 12,6 % dari durasi normal.

Kata Kunci: Tenaga Kerja, Crashing, Durasi, Biaya, shift
The construction of Damai Bridge experienced the constraints of heavy rain weather factors that resulted in river levels rising and flooding on February 1 - March 17 (46 Days Idle time) at the time of piling on the banks of the river side of Damai Seberang. With idle time, for 46 days caused the construction of the bridge to be late progress to minus 25%.
This delay requires an analysis of the acceleration of implementation time so that it can be achieved according to the initial target. This research uses the crashing method which is a method of speeding up the project systematically and analytically by shortening the project time. This method uses Microsoft Project with the option of adding labor and a work shift system.
From the results of the study, the project cost in the condition after crashing with the alternative of adding Labor was obtained at Rp. 28.531.756.479,7 or cheaper 0,759 % of the project cost under normal conditions and the project duration was 331 working days or faster than 9,31% of the normal duration, while the total cost of the project in conditions after crashing with the alternative of implementing a work shift system (shift 1, shift 2, shift 3, and shift 4) were obtained for Rp. 29.010.266.686,3 or more expensive 0,905 % of project costs under normal conditions and project duration of 319 days or faster than 12,6 % of normal duration.
Keywords: Labor, Crashing, Duration, Cost, shift

Item Type: Thesis (Other)
Uncontrolled Keywords: Tenaga Kerja, Crashing, Durasi, Biaya, shift ; Labor, Crashing, Duration, Cost, shift
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Fakultas Teknik Sipil dan Perencanaan > Teknik Sipil
Depositing User: suma SR romdani
Date Deposited: 25 Aug 2023 08:16
Last Modified: 25 Aug 2023 08:16
URI: https://repository.itny.ac.id/id/eprint/4196

Actions (login required)

View Item View Item