eprintid: 5835 rev_number: 18 eprint_status: archive userid: 343 dir: disk0/00/00/58/35 datestamp: 2024-12-09 03:20:37 lastmod: 2024-12-09 03:20:37 status_changed: 2024-12-09 03:20:37 type: thesis metadata_visibility: show creators_name: AZIS, MUH. REZA contributors_type: http://www.loc.gov/loc.terms/relators/THS contributors_type: http://www.loc.gov/loc.terms/relators/THS contributors_name: ., Supandi contributors_name: Wardana, Novandri Kusuma title: Analisis jarak lemparan flyrock untuk mengurangi radius aman alat pada kegiatan peledakan di PIT Kusan Girimulya Site PT. Borneo Indobara oleh PT. Putra Perkasa Abadi, kabupaten Tanah Bumbu, Kalimantan Selatan ispublished: unpub subjects: TN divisions: teknik_pertambangan keywords: Flyrock, Ebrahim Ghasemi, Blasting = Flyrock, Ebrahim Ghasemi, Blasting abstract: The safe radius standard that has been implemented by Drill & Blast Engineering PT. Putra Perkasa Abadi PT. Borneo Indobara refers to KEPMEN ESDM Number 1827 K/30/MEM/2018 which is 300 m for alar and 500 m for humans. However, as mining progressed, the pits began to narrow, coupled with a large number of blasting sites spread across the Kusan Girimulya Selatan pit, the tools began to find it difficult to evacuate to a safe radius. If in the current conditions a reduction in the safe radius of the tool is to be carried out, then an analysis is needed regarding the flyrock of the blasting activity, whether the safe radius can be reduced or still refers to the current regulations. The research was conducted by measuring the actual maximum throw distance of the flyrock in the field and calculating the theoretical maximum throw of the flyrock. Observations or data collection were carried out 25 times and the maximum throw of the flyrock was 131.06 m. This distance is shorter than 300 m, so a trial or further analysis is needed to reduce the safe radius of the tool to 200 m. By calculating the maximum flyrock throw distance using the dimensional analysis method by Ebrahim Ghasemi's theory by comparing the estimated flyrock throw based on the blasting geometry and the actual flyrock throw, the percentage error is 24,5% with an average throw distance of 70.55 m. Based on the results of the dimensional analysis, it is estimated that the theoretical longest throwing distance is 156,64 m. This indicates that the blasting geometry applied by PT. Putra Perkasa Abadi PT. Borneo Indobara is good enough, therefore it is concluded that the safe radius of the blasting device at the South Girimulya Kusan Pit can be reduced from 300 m to 200 m = Standar radius aman yang selama ini diterapkan oleh Drill & Blast Engineering PT. Putra Perkasa Abadi site PT. Borneo Indobara mengacu pada KEPMEN ESDM Nomor 1827 K/30/MEM/2018 yaitu 300 m untuk alar dan 500 m untuk manusia. Namun seiring berjalannya kemajuan penambangan, pit yang milai menyempit ditambah dengan lokasi peledakan yang cukup banyak dan menyebar pada pit Kusan Girimulya Selatan, alat mulai kesulitan untuk evakuasi bergerak menuju radius aman. Jika pada kondisi saat ini akan dilakukan penurunan radius aman alat, maka diperlukan analisis terkait flyrock dari kegiatan peledakan tersebut, apakah radius aman tersebut dapat dikurangi atau tetap mengacu pada aturan saat ini. Penelitian dilakukan dengan mengukur jarak lemparan maksimum flyrock secara aktual di lapangan dan menghitung lemparan maksimum flyrock secara teoritis. Pengamatan atau pengambilan data dilakukan sebanyak 25 kali dan didapatkan lemparan maksimal flyrock adalah 131,06 m. Jarak tersebut lebih pendek dari angka 300 m, maka diperlukan trial atau analisis lanjutan untuk mengurangi jarak radius aman alat menjadi 200 m. Dengan melakukan perhitungan jarak lemparan flyrock maksimum menggunakan metode analisis dimensi oleh teori Ebrahim Ghasemi dengan membandingkan perkiraan lemparan flyrock berdasarkan geometri peledakan dan lemparan flyrock aktual, maka didapatkan persentasi Error yaitu 24,5% dengan rata-rata jarak lemparan 70,55 m. Berdasarkan hasil analisis dimensi diperoleh perkiraan jarak lemparan terjauh teoritis yaitu sebesar 156,64 m hal tersebut menunjukkan bahwa penerapan geometri peledakan yang diterapkan oleh PT. Putra Perkasa Abadi site PT. Borneo Indobara sudah cukup baik maka dari itu disimpulkan bahwa radius aman alat peda peledakan di Pit Kusan Girimulya Selatan dapat dikurangi dari 300 m menjadi 200 m. date: 2023-05 date_type: completed official_url: https://repository.itny.ac.id full_text_status: restricted institution: Institut Teknologi Nasional Yogyakarta department: Fakultas Teknik dan Perencanaan : Teknik Pertambangan thesis_type: other thesis_name: other referencetext: Abdurrachman, Havis. 2015. Analisis Flyrock Untuk Mengurangi Radius Aman Alat Dari 300 Meter ke 200 Meter Pada Peledakan Overburden Di PIT Bendili, PT. Kaltim Prima Coal, Sangatta, Kalimantan Timur. UPN “Veteran” Yogyakarta, Daerah Istimewa Yogyakarta. Bhandari, S. 1997. Engineering Rock Blasting Operations, Balkema. Rotterdam. Bieniawski, Z.T., 1989. Engineering Rock Mass Classification: A Complete Manual for Engineers and Geologist in Mining Civil and Petroleum Engineering. John Wiley and Sons, Canada. BSW, P. (2006). Matriks Teori dan Aplikasi. Yogyakarta : Graha Ilmu. Ghasemi, E., Sari,M., & Ataei, M. 2012. Development of An Empirical Model For Predicting The Effects Of Controllable Blasting Parameters On Flyrock Distance In Surface Mines. International Journal of Rock Mechanics and Mining Sciences, Vol.52 : 163-170. Gokhale, B. (2011). Rotary Drilling And Blasting In Large Surface Mines Press/Balkema. Irwandy Arief., 2015. Geoteknik Tambang : Mewujudkan Produksi Tambang yang Kontinu Dengan Menjaga Kestabilan Lereng, Penerbit ITB, Bandung. Keputusan Menteri ESDM Nomor 1827 Tahun 2018 Tentang Pedoman Pelaksanaan Kaidah Teknik Pertambangan Yang Baik. Konya, CJ. 1995. Blast Design, Precision Blasting Services. Montville. Nadila, Guspani, P. 2022. Analisis Flyrock Untuk Mengurangi Jarak Aman Minimum Alat Pada Operasi Peledakan Overburden PT. Antareja Mahada Makmur Site PT. Multi Harapan Utama Kalimantan Timur. Novrianto. 2020. Analisis Pengaruh Geometri Peledakan Terhadap Flyrock Hasil Peledakan di PT. Bintang Sumatra Pacific Kec. Pangkalan Kab. Lima Puluh Kota Provinsi Sumatera Barat. Sekolah Tinggi Teknologi Industri Padang. Putri, H.A., Yuliadi & Marmer, D. 2017. Analisis Arah dan Jarak Lemparan Flyrock Akibat Kegiatan Peledakan di PT. Dahana Jobsite PT. Adaro Indonesia, Kabupaten Tabalong, Provinsi Kalimantan Selatan. Universitas Islam Bandung. Retnawati, H. (2017). Pengantar Analisis Regresi dan Korelasi. Pendidikan Matematika. Universitas Negeri Yogyakarta. Richard, A.B., & Moore, A.J. 2015. Golden Pike Cut-Back Flyrock Control and Calibration of a Predictive Model. Terrock Consulting Engineers : Australia. Saptono, S. (2012). Pengembangan Metode Analisis Stabilitas Lereng Berdasarkan Karakteristik Batuan di Tambang Terbuka Batubara. Institut Teknologi Bandung. citation: AZIS, MUH. REZA (2023) Analisis jarak lemparan flyrock untuk mengurangi radius aman alat pada kegiatan peledakan di PIT Kusan Girimulya Site PT. Borneo Indobara oleh PT. Putra Perkasa Abadi, kabupaten Tanah Bumbu, Kalimantan Selatan. Other thesis, Institut Teknologi Nasional Yogyakarta. document_url: https://repository.itny.ac.id/id/eprint/5835/1/Draft%20Skripsi_COVER_Muh.%20Reza%20Azis_710018160.pdf document_url: https://repository.itny.ac.id/id/eprint/5835/2/Draft%20Skripsi_BAB%201_Muh.%20Reza%20Azis_710018160.pdf document_url: https://repository.itny.ac.id/id/eprint/5835/3/Draft%20Skripsi_BAB%202_Muh.%20Reza%20Azis_710018160.pdf document_url: https://repository.itny.ac.id/id/eprint/5835/4/Draft%20Skripsi_BAB%203_Muh.%20Reza%20Azis_710018160.pdf document_url: https://repository.itny.ac.id/id/eprint/5835/5/Draft%20Skripsi_BAB%204_Muh.%20Reza%20Azis_710018160.pdf document_url: https://repository.itny.ac.id/id/eprint/5835/6/Draft%20Skripsi_BAB%205_Muh.%20Reza%20Azis_710018160.pdf document_url: https://repository.itny.ac.id/id/eprint/5835/7/Draft%20Skripsi_BAB%206_Muh.%20Reza%20Azis_710018160.pdf document_url: https://repository.itny.ac.id/id/eprint/5835/8/Jurnal_Muh.%20Reza%20Azis_710018160.pdf document_url: https://repository.itny.ac.id/id/eprint/5835/9/Draft%20Skripsi_DAFTAR%20PUSTAKA_Muh.%20Reza%20Azis_710018160.pdf document_url: https://repository.itny.ac.id/id/eprint/5835/10/Draft%20Skripsi_LAMPIRAN_Muh.%20Reza%20Azis_710018160.pdf