<> "The repository administrator has not yet configured an RDF license."^^ . <> . . . "Evaluasi produktivitas alat gali-muat dan alat angkut pada pengupasan tanah penutup di PIT 2 Barat PT Baturona Adimulya desa Supat Barat kecamatan Babat Supat kabupaten Musi Banyuasin provinsi Sumatera Selatan"^^ . "The overburden stripping activity in pit 2 west of PT Baturona Adimulya in\r\nSeptember had a production target of 200,000 BCM/month, work efficiency, cycle\r\ntime, the value of the macth factor measured from the digging and loading\r\nequipment and matching transportation equipment greatly affect the achievement\r\nof the company's production targets as a benchmark for activities. it worked.\r\nDirect observation activities were carried out in the field to get the value of work\r\nefficiency, productivity and the value of the macth factor of digging and loading\r\nequipment and transportation equipment. On the mining front, the excavation and\r\nloading process for September uses an excavator type Doosan Solar 500LCV and\r\nfor the transportation equipment used consists of two types, namely the Isuzu\r\nGiga FVZ34P type dump truck and the Articulated Dump Truck Caterpilar D400\r\ntype. From the results of activities on 2 (two) different fleets, the work efficiency\r\nvalue of the digging-loading equipment using the Doosan Solar 500LCV type\r\nexcavator on fleet 3 is 52.02%. For work efficiency of transportation equipment\r\non fleet 3 using Dump Truck type Isuzu Giga FVZ4P of 50.37%. The average\r\ncycle time for digging and loading equipment using the Doosan Solar 500LCV\r\nfleet 3 excavator is 0.46 minutes. Meanwhile, the average cycle time for\r\ntransportation equipment on fleet 3 using a Dump Truck of the Isuzu Giga\r\nFVZ34P type is 9.58 minutes. On a fleet of 3 Excavator Doosan Solar 500LCV it\r\nhas a productivity value of 192.84 BCM/hour/tool and for DT Isuzu Giga\r\nFVZ34P it is 35.86 BCM/hour/tool. The production value of the Doosan Solar\r\n500LCV excavator with a total of 5 tools is 401,158,43 BCM/month. And the\r\nproduction value of the DT Isuzu Giga FVZ34P transportation equipment with a\r\ntotal of 12 tools for DT so that a total of 17 tools is 286,150,11 BCM/month.\r\nBased on the results of observations and calculations, it is known that\r\noverburden stripping activities on a fleet of 3 Excavator Doosan Solar 500LCV\r\nwith DT Isuxu Giga FVZ34P, transportation equipment is waiting more, which is\r\nseen from the match factor value, namely 1,15 = Kegiatan pengupasan overburden di pit 2 barat PT Baturona Adimulya\r\npada bulan September memiliki target produksi 200.000 BCM/bulan, Efisiensi\r\nkerja, cycle time, nilai macth factor diliah dari alat gali-muat dan alat angkut yang\r\nserasi sangat mempengaruhi ketercapaian target produksi perusahanan sebagai\r\npatokan kegian tersebut berhasil. Dilakukan kegiatan pengaamatan langsung\r\ndilapangan untuk mendapatankan nilai efisiensi kerja, produktivittas dan nilai\r\nmacth factor alat gali-muat serta alat angkut. Pada front penambangan proses galimuat untuk bulan September menggunakan alat gali-gali muat excavator tipe\r\nDoosan Solar 500LCV serta untuk alat angkut yang digunakan terdiri dari dua\r\njenis yaitu dump truck tipe Isuzu Giga FVZ34P dan Articulated Dump Truck tipe\r\nCaterpilar D400. Dari hasil kegiatan pada 2(dua) fleet yang berbeda didapat nilai\r\nefisiensi kerja alat gali-muat menggunakan excavator tipe Doosan Solar 500LCV\r\npada fleet 3 sebesar 52,02%. Untuk efisiensi kerja alat angkut pada pada fleet 3\r\nmenggunakan Dump Truck tipe Isuzu Giga FVZ4P sebesar 50,37%. Cycle time\r\nrata-rata untuk alat gali-muat dengan menggunakan excavator tipe Doosan Solar\r\n500LCV fleet 3 yaitu 0,46menit. Sementara cycle time rata-rata untuk alat angkut\r\npada fleet 3 dengan menggunakan Dump Truck tipe Isuzu Giga FVZ34P yaitu\r\n9,58 menit. Pada fleet 3 Excavator Doosan Solar 500LCV memiliki nilai\r\nproduktivitas sebesar 192,84 BCM/jam/alat dan untuk DT Isuzu Giga FVZ34P\r\nsebesar 35,86 BCM/jam/alat. Nilai produksi alat gali-muat Excavator Doosan\r\nSolar 500LCV dengan jumlah 5 alat sebesar 401,158,43 BCM/bulan. Dan nilai\r\nproduksi alat angkut DT Isuzu Giga FVZ34P dengan jumlah 12 alat untuk DT\r\nsehinga total 17 alat yaitu sebesar 286,150,11 BCM/bulan. Berdasarkan hasil\r\npengamatan dan perhitungan diketahui kegiatan pengupasan overburden pada\r\nfleet 3 Excavator Doosan Solar 500LCV dengan DT Isuxu Giga FVZ34P, alat\r\nangkut lebih banyak menunggu dimana dilihat dari nilai match factor nya yaitu\r\n1,15."^^ . "2022-02-10" . . . . . . . . . . . . . "Institut Teknologi Nasional Yogyakarta"^^ . . . "Fakultas Teknik dan Perencanaan : Teknik Pertambangan, Institut Teknologi Nasional Yogyakarta"^^ . . . . . . . . . . . "Hendro"^^ . "Purnomo"^^ . "Hendro Purnomo"^^ . . "R. Andy Erwin"^^ . "Wijaya"^^ . "R. Andy Erwin Wijaya"^^ . . "BAMBANG SONY"^^ . "GUNAWAN"^^ . "BAMBANG SONY GUNAWAN"^^ . . . . . . "Evaluasi produktivitas alat gali-muat dan alat angkut pada pengupasan tanah penutup di PIT 2 Barat PT Baturona Adimulya desa Supat Barat kecamatan Babat Supat kabupaten Musi Banyuasin provinsi Sumatera Selatan (Text)"^^ . . . "Evaluasi produktivitas alat gali-muat dan alat angkut pada pengupasan tanah penutup di PIT 2 Barat PT Baturona Adimulya desa Supat Barat kecamatan Babat Supat kabupaten Musi Banyuasin provinsi Sumatera Selatan (Text)"^^ . . . "Evaluasi produktivitas alat gali-muat dan alat angkut pada pengupasan tanah penutup di PIT 2 Barat PT Baturona Adimulya desa Supat Barat kecamatan Babat Supat kabupaten Musi Banyuasin provinsi Sumatera Selatan (Text)"^^ . . . "Evaluasi produktivitas alat gali-muat dan alat angkut pada pengupasan tanah penutup di PIT 2 Barat PT Baturona Adimulya desa Supat Barat kecamatan Babat Supat kabupaten Musi Banyuasin provinsi Sumatera Selatan (Text)"^^ . . . "Evaluasi produktivitas alat gali-muat dan alat angkut pada pengupasan tanah penutup di PIT 2 Barat PT Baturona Adimulya desa Supat Barat kecamatan Babat Supat kabupaten Musi Banyuasin provinsi Sumatera Selatan (Text)"^^ . . . "Evaluasi produktivitas alat gali-muat dan alat angkut pada pengupasan tanah penutup di PIT 2 Barat PT Baturona Adimulya desa Supat Barat kecamatan Babat Supat kabupaten Musi Banyuasin provinsi Sumatera Selatan (Text)"^^ . . . "Evaluasi produktivitas alat gali-muat dan alat angkut pada pengupasan tanah penutup di PIT 2 Barat PT Baturona Adimulya desa Supat Barat kecamatan Babat Supat kabupaten Musi Banyuasin provinsi Sumatera Selatan (Text)"^^ . . . "DRAFT20SKRIPSI20BAMBANG20SONY20GUNAWAN20710015065-64.pdf"^^ . . . "Evaluasi produktivitas alat gali-muat dan alat angkut pada pengupasan tanah penutup di PIT 2 Barat PT Baturona Adimulya desa Supat Barat kecamatan Babat Supat kabupaten Musi Banyuasin provinsi Sumatera Selatan (Text)"^^ . . . "Evaluasi produktivitas alat gali-muat dan alat angkut pada pengupasan tanah penutup di PIT 2 Barat PT Baturona Adimulya desa Supat Barat kecamatan Babat Supat kabupaten Musi Banyuasin provinsi Sumatera Selatan (Text)"^^ . . . "Evaluasi produktivitas alat gali-muat dan alat angkut pada pengupasan tanah penutup di PIT 2 Barat PT Baturona Adimulya desa Supat Barat kecamatan Babat Supat kabupaten Musi Banyuasin provinsi Sumatera Selatan (Text)"^^ . . . "Evaluasi produktivitas alat gali-muat dan alat angkut pada pengupasan tanah penutup di PIT 2 Barat PT Baturona Adimulya desa Supat Barat kecamatan Babat Supat kabupaten Musi Banyuasin provinsi Sumatera Selatan (Text)"^^ . . . "ilovepdf_merged - 2024-12-06T021011.581.pdf"^^ . . "HTML Summary of #5830 \n\nEvaluasi produktivitas alat gali-muat dan alat angkut pada pengupasan tanah penutup di PIT 2 Barat PT Baturona Adimulya desa Supat Barat kecamatan Babat Supat kabupaten Musi Banyuasin provinsi Sumatera Selatan\n\n" . "text/html" . . . "TN Mining engineering. Metallurgy"@en . .