eprintid: 5812 rev_number: 17 eprint_status: archive userid: 343 dir: disk0/00/00/58/12 datestamp: 2024-12-05 04:00:24 lastmod: 2024-12-05 04:00:24 status_changed: 2024-12-05 04:00:24 type: thesis metadata_visibility: show creators_name: AFRIYANI, LYDIA contributors_type: http://www.loc.gov/loc.terms/relators/THS contributors_type: http://www.loc.gov/loc.terms/relators/THS contributors_name: ., Supandi contributors_name: Sumarjono, Erry title: Pengaruh ground vibration akibat peledakan terhadap kestabilan lereng PT. Putra Perkasa Abadi jobsite PT. Borneo Indobara, Kalimantan Selatan ispublished: unpub subjects: TN divisions: teknik_pertambangan keywords: Amax, Isian Optimum, Jarak, Getaran Peledakan, PPA. abstract: PT. Putra Perkasa Abadi (PPA) merupakan salah satu kontraktor penambangan Batubara yang dipercaya oleh PT. Borneo Indobara (BIB) selaku pemegang PKP2B yang rutin melakukan kegiatan peledakan dengan tujuan mengurangi masa digging time. Kegiatan peledakan yang dilakukan dapat menghasilkan beberapa dampak, salah satunya ialah getaran tanah (ground vibration) dimana pada pit KG utara sendiri masih sangat aktif dilakukan kegiatan produksi sehingga diharapkan efek getaran tanah tidak menggangu kestabilan lereng yang nantinya dapat mengganggu kegiatan produksi tersebut. Beberapa faktor yang harus diperhatikan dalam kegiatannya, salah satunya adalah geometri hingga pada kestabilan pada lereng penambangan serta target produksi yang harus dihasilkan dalam jangka waktu tertentu. Geometri lereng harus didesain dengan optimal agar dapat meningkatkan potensi batubara yang dapat diambil namun tetap memperhatikan kestabilan lereng. Hasil penelitian menunjukan bahwa semakin jauh jarak peledakan maka nilai getaran akan semakin kecil. Penelitian dilakukan dengan melakukan pengukuran getaran tanah akibat peledakan di lereng final dan lereng aktif, data sifat fisik dan mekanik batuan penyusun lereng dan geometri lereng aktual. Data tersebut diolah menggunakan software Slide 6.0 dengan analisis Pseudostatik. Nilai PPA yang didapat dari hasil pengukuran tidak dapat langsung digunakan dalam perhitungan, nilai percepatan sebagai faktor seismik yang disebut dengan percepatan horizontal adalah percepatan ketika terjadi perpindahan maksium dan kecepatan maksimum. Berdasarkan hasil perhitungan Faktor Keamanan (FK) lereng final dengan nilai Amax sebesar 0,08 nilai FK lereng statis 1,480 dan lereng dinamis 1,28. Nilai Amax pada lereng aktif dengan nilai percepatan horizontal sebesar 0,08 nilai FK lereng statis 1,705 dan lereng dinamis 1,3. Dari seluruh pengukuran nilai getaran diperoleh korelasi antara nilai PPA terhadap Scale Distance dan korelasi antara PPA dan Amax sehingga diperoleh jarak dan muatan yang optimum terhadap peledakan pada lereng final sejauh 150 meter dengan muatan maksimum 40,7 kg/delay dan pada lereng aktif sejauh 450 meter dengan muatan maksimum 63 kg/delay untuk mendapatkan lereng yang aman dan terjaga dengan nilai Amax kritis masih mnegacu pada nilai perusahaan. Jarak dan isian muatan ini menjadi batas optimum dilakukannya kegiatan peledekan dan jika jarak peledakan kurang dari yang diperkirakan dengan nilai muatan yang diperbanyak akan adanya kemungkinan terjadi longsoran pada lereng, maka perubahan desain peledakan harus dilakukan untuk mengurangi dampak getaran. date: 2022-08 date_type: completed official_url: https://repository.itny.ac.id full_text_status: restricted institution: Institut Teknologi Nasional Yogyakarta department: Fakultas Teknik dan Perencanaan : Teknik Pertambangan thesis_type: other thesis_name: other referencetext: Alwi, W. (2021). Analisis Penentuan Batas Aman Ground Vibration Akibat Aktivitas Peledakan Terhadap Kestabilan Lereng Di Dinding Timur Pit Toka Stage 5, Pt. Meares Soputan Mining, Kabupaten Minahasa Utara, Provinsi Sulawesi Utara. Yogyakarta: Institut Teknologi Nasional Yogyakarta. Arif, I. (2016). Geoteknik Tambang. Jakarta: Gramedia Pustaka Utama. Arif, S. (2008). Metode Dalam Analisis Kestabilan Lereng. As'Ari, S. H. (2016). Analisis Penentuan Batas Aman Ground Vibration Akibat Kegiatan Peledakan Terhadap Kestabilan Lereng Highwall Penambangan Pit 13 West Pt. Multi Harapan Utama, Samarinda, Kalimantan Timur. JURNAL MIPA UNSRAT ONLINE 5 (2) 99-102, 4. Ash, R. L. (1967). Design of Blasting Rounds. New York: American Institut of Mining Engineering Basuki, S. (2011). Analisis Kestabilan Lereng Section 10 Akibat Pengaruh Getaran Peledakan dan Air Tanah PT. Pama Persada . Bandung: Institut Teknologi Bandung. Bhandari, S. 1997. Engineering Rock Blasting Operations. Rotterdam: AA Balkema. Canima, D., & Heriyadi, B. (2019). Analisis Penentuan Batas Aman Ground Vibration Akibat Kegiatan Peledakan Terhadap Kestabilan Lereng Highwall Penambangan Pit 13 West PT. Multi Harapan Utama, Samarinda, Kalimantan Timur. Jurnal Bina Tambang, Vol. 4, No. 4 , 15. Daryati, N. F. (2021). Analisis Ground Vibration Pada Kegiatan Peledakan Menggunakan Pendekatan Ppv Di 206 Pt. Semen Padang. Jurnal Indonesia Sosial Teknologi: p–ISSN: 2723 - 6609 e-ISSN : 2745-5254 , 12. Diky Canima, B. H. (2019). Analisis Penentuan Batas Aman Ground Vibration Akibat Kegiatan Peledakan Terhadap Kestabilan Lereng Highwall Penambangan Pit 13 West PT. Multi Harapan Utama, Samarinda, Kalimantan Timur . Jurnal Bina Tambang, Vol. 4, No. 4 , 15. Fajar, M. I. (2019). Analisis Kestabilan Lereng Dengan Pengaruh Getaran Tanah Akibat Peledakan Overburden di PIT South Tutupan PT. Adaro Indonesia . Sumatera Utara: Universitas Sriwijaya. Hoek, E., dan Bray, J.D. 1981. Rock Slope Engineering 3th Edition. CRC Press: Florida. Hustrulid, Wiliam. 1999. Blastiing Principles for Open Pit Mining, AA. Blakema. Balkema/Rotterdam/Brookfield. Indogeologist. (2018, 07). From https://indogeologist.blogspot.com/search/label/Peta%20Geologi%20Regi onal%20Pulau%20Kalimantan Instantel. (2020). Micromate. Canada, USA: Istantel. Instantel. 2015. Micromate Operator Manual. Canada: Instantel Inc. Jacob, F., T. Belytschko. 2007. A First Coursein Finite Elements. West Sussex, England. John Wiley & Sons Ltd. Jimeno C.L, Jinemo E.L, Carcedo F.J.A. 1995. Drilling and Blasting Of Rocks. AA. Blakema. Balkema/Rotterdam/Brookfield. Kementerian Energi dan Sumber Daya Alam. 2008. Keputusan Menteri ESDM Nomor 1827 K 30 MEM 2018. Konya, C. (1990). Surface Blast Design. Lucca, Frank J. 2003. Effective Blast Design and Optimization. Terra Dinamica L.L.C M. Monjezi, M. G. (2011). Prediction Of Blast-Induced Ground Vibration Using Artificial Neural Networks. Tunelling and Underground Space Technology 26 (2011) 46-50, 5. M. Mpofu, S. N. (2021). The influence of stemming practice on ground vibration and air blast. The Journal of the Southern African Institute of Mining and Metallurgy , 10. M. Romi Noviansyah, T. T. (2017). Rancangan Sistem Waktu Tunda Peledakan Nonel Untuk Mengurangi Efek Getaran Tanah Terhadap Fasilitas Tambang. JP Vol.1 No.3 Mei 2017 ISSN 2549-1008, 10. Mahdi Saadat, M. K. (2014). An ANN-Based Approach To Predict Blast-Inducet Ground Vibration Of Gol-E-Gihar Iron Mine, Iran . Journal Of Rock Mechanics and Geothecnical Engineering 6 (2014) 67-76, 10. Marcusson, W. F. (1981). Proceedings, International Conference on Recent Advances in Geotechinal Earthquake Engineering and Soil Dynamics . Missouri University of Science and Techonolgy. Maryura, R., Toha, M. T., & Sudarmono, D. (2019). Kajian Pengurangan Tingkat Getaran Tanah ( Ground Vibration Level ) Pada Operasi Peledakan Interburden B2-C Tambang Batubara Air Laya Pt. Bukit Asam ( Persero ), Tbk Tanjung Enim. 8. Matsuo, M. (1984). Geotechnical Engineering : Theory and Practice of Reability Design. Tokyo: Gihoudo. Monia Aloui, Y. B. (2016). Ground Vibrations and Air Blast Effects Induced by Blasting in Open Pit Mines: Case of Metlaoui Mining Basin, Southwestern Tunisia . Journal of Geology & Geophysics Aloui et al., J Geol Geophys 2016, 5:3 , 8. Napuri, J, dan Tamrock. 1988. Surface Drilling and Blasting. Finland: Tampere. Nateghi, R. (2011). Prediction Of Ground Vibration Level Induced By Blasting At Different Rock Units. International Journal Of Rocks Mechanics & Mining Sciences 48 (2011) 899-908, 10. Novrinda, Riza ., Irfan Saputra., 2016. Analisis Kemantapan Lereng Kuari Batugamping di Tuban II PT. United Tractors Semen Gresik Tuban Jawa Timur. Prosiding Seminar Nasional XI “Rekayasa Teknologi Industri dan Informasi. Sekolah Tinggi Teknologi Nasional Yogyakarta. Nugraha, F., Yuliadi, & Wijaksana , I. K. (2021). Analisis Pengaruh Getaran Tanah Terhadap Kestabilan Lereng Low Wall Dan Side Wall Di Pit Mahoni Pt Kalimantan Prima Persada, Desa Sabah, Kecamatan Bungur, Kab Tapin, Provinsi Kalimantan Selatan. Prosiding Teknik Pertambangan , Volume 7, No. 1, 8. Princessca, C., Manar, M. H., Sophian, I., & Zakaria, Z. (Juni 2020). Pengaruh Getaran Peledakan Terhadap Kestabilan Lereng Pit Central Tutupan, Pt Adaro Indonesia, Kalimantan Selatan. Padjadjaran Geoscience Jornal, Vol. 4, No. 3, 9. R, C. F., 2004. Air-decking techniques for controlled blasting in open pits. Office of Science. R Shirani Faradonbeh, D. J. (2016). Prediction of ground vibration due to quarry blasting based on gene expression programming: a new model for peak particle velocity prediction. Int. J. Environ. Sci. Technol. (2016) 13:1453– 1464, 12. Rahardjo, W. &. (2010, Agustus 24). Peta Geologi Lembar Yogyakarta. Retrieved November 15, 2021 from https://geologi.co.id/2010/08/24/peta-geologilembar-yogyakarta/ Ranjan Kumar, D. C. (2015). Determination Of Blast-Induced Ground Vibration Equations For Rocks Using Mechanical And Geological Properties. Jurnal of rock mechanics and Geothecnical Engineering 8 (2016) 341-349, 9. Rezassalam, A. A.-F. (2018). Analisis Ground Vibration Dengan Zonasi Metode Signature Hole Analysis (Sha) Pada Kegiatan Peledakan Di Pt. Adaro Indonesia Provinsi Kalimantan Selatan. Yogyakarta: Universitas Pembangunan Nasional "Veteran". Rizka , M. S., Fahrudin, & San, N. (2017). Analisis Pengaruh Getaran Peledakan Terhadap Kestabilan Lereng Pada. Promine Journal, Vol. 5 (1), page 1 - 9 , 9. Roby Cahyadi, T. T. (2017). Analisis Korelasi Scaled Distance Terhadap Getaran Tanah Pada Operasi Peledakan Batu Kapur PT. Semen Baturaja (PERSERO). Jurnal Teknik Patra Akademika Volume 08 No 02 Desember 2017, 13. Rudini. (n.d.). Analisis Ground Vibration Pada Peledakan Overburden Di Panel 4 PIT J PT. Kaltim Prima Coa, Sangatta, Kalimantan Timur. l, 10. Rusmawarni, N. R. (Agustus 2016 : 45 - 49 ). Evaluasi Isian Bahan Peledak Berdasarkan Ground Vibration Hasil Peledakan Overburden Pada Tambang Batubara Di Kalimantan Selatan. Jurnal Himasapta, Vol. 1, No.2, 5. Rustandi, E., Nila, E. S., Sanyoto, P., & Margono, U. (n.d.). Peta Geologi Lembar Kotabaru, Kalimantan. Peta Geologi Bersistem Indonesia. Pusat Penelitian dan Pengembangan Geologi, Indonesia. Sanjaya, D. R. (n.d.). Analisis Pengaruh Dan Rekomendasi Percepatan Getaran Horizontal Maksimum (Amax) Pada Proses Peledakan Terhadap Stabilitas Lereng Pit Batu Hijau Pt Amman Mineral Nusa Tenggara. Makassar: Universitas Hasanudin. Satyana. (1999). Geologi dan Potensi Sumberdaya Batubara, Daerah Dambung Raya, Kecamatan Bintang Ara, Kabupaten Tabalong, Propinsi Kalimantan Selatan . In BAB II Geologi Regional (p. 8). Bandung: Institut Teknologi Bandung. Seed, H. B. (1979). Considerations in The Earthquake Resistant Design of Earth. Geotechnique 29 Silva-Castro, J.J. 2012. Blast Vibration Modeling Using Improved Signature Hole Technique For Bench Blasting. College of Engineering University of Kentucky. Lexington Kentucky Smith, J, dan MeCabe W.L. (1976). Unit Operations of Chemical Engineering. New York: McGraw-Hill Company. Srdan Kostic, M. P. (2013). Predictions of Experimentally Observed Stochastic Ground Vibrations Induced by Blasting. PLOS ONE , 13. Standar Nasional Indonesia. 2010. Baku Tingkat Getaran Peledakan Pada Kegiatan Tambang Terbuka Terhadap Bangunan. Jakarta: Badan Standarisasi Nasional. Sudjarwadi, E. (2019, Meret). Pelatihan Online (Kebumian-Paket15 ed.). ALC.INDONESIA.CO.ID. Retrieved November 16, 2012 from https://docplayer.info/204067011-Pelatihan-online-2019-kebumian-paket15.html Suwandhi, A. (2020). Efek Peledakan Tambang Terhadap Kestabilan Lereng. Bandung: Sekolah Tinggi Teknologi Mineral Indonesia. Terzaghi, K. And Peck, R. B. 1967. Soil Mechanics in Enggineering Practice. John Willey & Sons Ltd. New York. United States. Bureau of Mines dan Siskind, D.E. 1980. Structure Response and Damage Produced by Ground Vibration from Surface Mine blasting (hal. 74). New York, NY, USA: US Department of the Interior, Bureau of Mines Wesley, L. D. (2012). Mekanika Tanah untuk Tanah Endapan dan Residu. Yogyakarta: Andi Press. Wong, H. N. and Pang P. L. R. (1992). Assessment of Stability of Slope Subjected to Blasting Vibration. Hongkong: Geotechnical Engineering Office. Z Xenios, A. B. (2020). Prediction of blast-induced ground vibrations with the use of artificial neural networks. A case study in Greece. Earth and Environmental Science 703 (2021) 012033, 11. Zhang, Z.-X. 2016. Rock Fracture and Blasting: Theory and Applications. Amsterdam: Elsevier. citation: AFRIYANI, LYDIA (2022) Pengaruh ground vibration akibat peledakan terhadap kestabilan lereng PT. Putra Perkasa Abadi jobsite PT. Borneo Indobara, Kalimantan Selatan. Other thesis, Institut Teknologi Nasional Yogyakarta. document_url: https://repository.itny.ac.id/id/eprint/5812/1/01%20%281%29.pdf document_url: https://repository.itny.ac.id/id/eprint/5812/2/06.%20BAB%20I.pdf document_url: https://repository.itny.ac.id/id/eprint/5812/3/07.%20BAB%20II.pdf document_url: https://repository.itny.ac.id/id/eprint/5812/4/08.%20BAB%20III.pdf document_url: https://repository.itny.ac.id/id/eprint/5812/5/09.%20BAB%20IV.pdf document_url: https://repository.itny.ac.id/id/eprint/5812/6/10.%20BAB%20V.pdf document_url: https://repository.itny.ac.id/id/eprint/5812/7/11.%20BAB%20VI.pdf document_url: https://repository.itny.ac.id/id/eprint/5812/8/PAPER%20SKRIPSI.pdf document_url: https://repository.itny.ac.id/id/eprint/5812/9/12.%20DAFTAR%20PUSTAKA.pdf document_url: https://repository.itny.ac.id/id/eprint/5812/10/LAMPIRAN.pdf