<> "The repository administrator has not yet configured an RDF license."^^ . <> . . . "Optimalisasi produksi alat gali muat PC 200 LC-8 dan alat angkut hino FM 260 JD pada kegiatan penambangan bijih bauksit di PT. Ricopec Indonesia kabupaten Sanggau provinsi Kalimantan Barat"^^ . "PT. Ricopec Indonesia is a production operation mining permit (IUP) company which is\r\nengaged in the business of mining bauxite ore. PT. Ricopec Indonesia is included in the Meliau District,\r\nSanggau Regency, West Kalimantan Province. Mining activities implemented by PT. Ricopec is a surface\r\nmine.\r\nBauxite ore mining activities are carried out using open pit and open cut methods, open pit\r\nmining is carried out from a relatively flat surface downward following the ore deposit, while open cut is\r\ncarried out on the slopes of a hill, so the application of open pit and open cut depends on the location and\r\nshape of the deposit. Bauxite ore to be mined. The purpose of this research is to determine the real or\r\nactual production of loading and unloading equipment and transportation equipment in bauxite ore\r\nmining activities and to find out the causes of not achieving the production of loading and unloading\r\nequipment and transportation equipment. Bauxite ore mining activities at PT. Ricopec Indonesia uses a\r\ncombination of 1 Komatsu PC 200 LC-8 excavator with 6 Hino FM 260 JD dump trucks. The set\r\nproduction target is 100,000 tons/month. The actual production obtained on the Komatsu PC 200 LC-8\r\nfleet is 73,767 tons/month where the current production target has not been achieved.\r\nEfforts to increase production targets are carried out by improving the cycle time of loading and\r\nunloading equipment and transportation equipment, and improving work efficiency. As for the calculation\r\nafter making repairs, the productivity of repairs obtained on the Komatsu PC 200 LC-8 fleet is 93,030\r\ntons/month. Thus, the set production target can be achieved = PT. Ricopec Indonesia merupakan perusahaan pemegang izin usaha pertambangan (IUP) operasi\r\nproduksi yang bergerak dalam bidang usaha pertambangan bijih bauksit. PT. Ricopec Indonesia ini\r\ntermasuk dalam wilayah Kecamatan Meliau, Kabupaten Sanggau, Provinsi Kalimantan Barat. Kegiatan\r\npenambangan yang diterapkan PT. Ricopec adalah tambang terbuka (surface mine).\r\nKegiatan penambangan bijih bauksit dilakukan dengan menggunakan metode open pit dan open cut,\r\npenambangan open pit dilakukan dari permukaan yang relatif mendatar kebawah mengikuti endapan biji,\r\nsedangkan open cut dilakukan pada lereng suatu bukit, jadi penerapan open pit dan open cut tergantung\r\npada letak dan bentuk endapan bijih bauksit yang akan ditambang.\r\nTujuan dilakukan penelitian ini adalah untuk mengetahui produksi nyata atau aktual dari alat gali muat\r\ndan alat angkut pada kegiatan penambangan bijih bauksit dan mengetahui penyebab tidak tercapainya\r\nproduksi alat gali muat dan alat angkut. Kegiatan penambangan bijih bauksit di PT. Ricopec Indonesia\r\nmenggunakan kombinasi 1 unit excavator Komatsu PC 200 LC-8 dengan 6 unit dump truck Hino FM 260\r\nJD. Target produksi yang ditetapkan adalah 100.000 ton/bulan. Produksi nyata yang didapatkan pada fleet\r\nKomatsu PC 200 LC-8 sebesar 73.767 ton/bulan dimana target produksi saat ini belum tercapai.\r\nUpaya peningkatan target produksi dilakukan dengan cara perbaikan cycle time alat gali muat\r\ndan alat angkut, dan memperbaiki efisiensi kerja. Adapun perhitungan setelah melakukan perbaikan,\r\nproduktivitas perbaikan yang didapatkan pada fleet Komatsu PC 200 LC-8 sebesar 93.030 ton/bulan.\r\nDengan demikian maka target produksi yang ditetapkan dapat tercapai."^^ . "2021-11-17" . . . . . . . . . . . . "Institut Teknologi Nasional Yogyakarta"^^ . . . "Fakultas Teknik dan Perencanaan : Teknik Pertambangan, Institut Teknologi Nasional Yogyakarta"^^ . . . . . . . . . . . "Agustinus"^^ . "Isjudarto"^^ . "Agustinus Isjudarto"^^ . . "RAYHAN"^^ . "AZHARY"^^ . "RAYHAN AZHARY"^^ . . "Hidayatullah"^^ . "Sidiq"^^ . "Hidayatullah Sidiq"^^ . . . . . . "Optimalisasi produksi alat gali muat PC 200 LC-8 dan alat angkut hino FM 260 JD pada kegiatan penambangan bijih bauksit di PT. Ricopec Indonesia kabupaten Sanggau provinsi Kalimantan Barat (Text)"^^ . . . "cover-daftar isi.pdf"^^ . . . "Optimalisasi produksi alat gali muat PC 200 LC-8 dan alat angkut hino FM 260 JD pada kegiatan penambangan bijih bauksit di PT. Ricopec Indonesia kabupaten Sanggau provinsi Kalimantan Barat (Text)"^^ . . . "Optimalisasi produksi alat gali muat PC 200 LC-8 dan alat angkut hino FM 260 JD pada kegiatan penambangan bijih bauksit di PT. Ricopec Indonesia kabupaten Sanggau provinsi Kalimantan Barat (Text)"^^ . . . "Optimalisasi produksi alat gali muat PC 200 LC-8 dan alat angkut hino FM 260 JD pada kegiatan penambangan bijih bauksit di PT. Ricopec Indonesia kabupaten Sanggau provinsi Kalimantan Barat (Text)"^^ . . . "Optimalisasi produksi alat gali muat PC 200 LC-8 dan alat angkut hino FM 260 JD pada kegiatan penambangan bijih bauksit di PT. Ricopec Indonesia kabupaten Sanggau provinsi Kalimantan Barat (Text)"^^ . . . "Optimalisasi produksi alat gali muat PC 200 LC-8 dan alat angkut hino FM 260 JD pada kegiatan penambangan bijih bauksit di PT. Ricopec Indonesia kabupaten Sanggau provinsi Kalimantan Barat (Text)"^^ . . . "Optimalisasi produksi alat gali muat PC 200 LC-8 dan alat angkut hino FM 260 JD pada kegiatan penambangan bijih bauksit di PT. Ricopec Indonesia kabupaten Sanggau provinsi Kalimantan Barat (Text)"^^ . . . "Optimalisasi produksi alat gali muat PC 200 LC-8 dan alat angkut hino FM 260 JD pada kegiatan penambangan bijih bauksit di PT. Ricopec Indonesia kabupaten Sanggau provinsi Kalimantan Barat (Text)"^^ . . . "Optimalisasi produksi alat gali muat PC 200 LC-8 dan alat angkut hino FM 260 JD pada kegiatan penambangan bijih bauksit di PT. Ricopec Indonesia kabupaten Sanggau provinsi Kalimantan Barat (Text)"^^ . . . "DAFTAR PUSTAKA.pdf"^^ . . . "Optimalisasi produksi alat gali muat PC 200 LC-8 dan alat angkut hino FM 260 JD pada kegiatan penambangan bijih bauksit di PT. Ricopec Indonesia kabupaten Sanggau provinsi Kalimantan Barat (Text)"^^ . . "HTML Summary of #5754 \n\nOptimalisasi produksi alat gali muat PC 200 LC-8 dan alat angkut hino FM 260 JD pada kegiatan penambangan bijih bauksit di PT. Ricopec Indonesia kabupaten Sanggau provinsi Kalimantan Barat\n\n" . "text/html" . . . "TN Mining engineering. Metallurgy"@en . .