eprintid: 5745 rev_number: 17 eprint_status: archive userid: 343 dir: disk0/00/00/57/45 datestamp: 2024-11-26 02:30:49 lastmod: 2024-11-26 02:30:49 status_changed: 2024-11-26 02:30:49 type: thesis metadata_visibility: show creators_name: BAHY, MUHAMMAD NAUVAL contributors_type: http://www.loc.gov/loc.terms/relators/THS contributors_type: http://www.loc.gov/loc.terms/relators/THS contributors_name: Adnyano, A.A. Inung Arie contributors_name: Prastowo, Rizqi title: Kajian teknis sistem penyaliran tambang dengan mine dewatering pada tambang andesit di CV. Anugerah Bumi Cilacap dusun Bulupayung, kecamatan Kesugihan, kabupaten Cilacap, Jawa Tengah ispublished: unpub subjects: TN divisions: teknik_pertambangan keywords: Draining system, main sump, drainage system = Sistem penyaliran, main sump, Paritan abstract: A drainage system is a method of drying or removing water that has accumulated or swamped a specific region. The mine drainage system, on the other hand, is a collection of tools and pieces of the drainage system that are designed to regulate mine water. This attempt is made to avoid mining activities being disrupted as a result of severe water logging at the mine site, especially during the rainy season. Furthermore, the mine drainage system is designed to reduce equipment damage and extend the life of the mechanical equipment utilized in the region. The study of literature and observation of outdoor situations are used as research methods. An open channel system with pumping is employed in CV. Anugerah Bumi Cilacap mine drainage system. A trapezoidal open channel is created around the mining site, which is then routed to the settling pond. Efforts are made to drain the water that has reached the main sump (Mine Dewatering System) by drilling a well, and then channeling it to the settling pond using a pump. The study site is located on CV. Anugerah Bumi Cilacap, with a primary sump base of 129 mdpl and a sludge settling pond of 142 mdpl, as well as an open channel encircling the mining area. The goal of this research is to establish the total water discharge into the research site, build the sump, and design the ditch proportions. At the research site, the total water discharge into the sump is 157,52 m³/s, resulting in a volume of 225 m³ for the sump, and 0.0237 m³/s for the ditch, resulting in a volume of 0.228 m for the ditch = Sistem penyaliran adalah suatu cara untuk mengeringkan atau mengeluarkan air yang terdapat atau menggenangi suatu daerah tertentu. Sedangkan sistem penyaliran tambang adalah rangkaian unit kerja dari alat/bagian pada sistem penyaliran yang dimaksudkan untuk mengendalikan air tambang. Upaya ini dilakukan untuk mencegah terganggunya aktivitas penambangan akibat adanya genangan air dalam jumlah yang berlebihan di lokasi penambangan, terutama pada musim hujan. Selain itu, sistem penyaliran tambang ini juga dimaksudkan untuk meminimalisir kerusakan alat, sehingga alat-alat mekanis yang digunakan pada daerah tersebut mempunyai umur yang lama. Metode penelitian dari studi literatur dan observasi kondisi lapangan. Sistem penyaliran tambang yang digunakan di CV. Anugerah Bumi Cilacap yaitu dengan sistem saluran terbuka dan juga pemompaan. saluran terbuka berbentuk trapesium yang dibuat disekitar lokasi penambangan, saluran terbuka tersebut selanjutnya dialirkan menuju ke setlingpond dan upaya yang dilakukan untuk mengalirkan air yang telah masuk kedalam main sump (Mine Dewatering System) dilakukan dengan membuat sumuran dan setelah itu dialirkan menuju kolam pengendapan dengan menggunakan pompa Lokasi penelitian terletak pada CV. ABC dengan dasar main sump berada di elevasi 129 mdpl dan kolam pengendapan lumpur berada di elevasi 142 mdpl dengan saluran terbuka yang mengelilingi area penambangan. Pada penelititan ini bertujuan untuk mengetahui debit air total yang masuk ke lokasi penetlitian, merancang sump, dan merancang penampang dimensi paritan. Pada lokasi penelitian debit air total yang masuk kedalam sump 157,52m³/jam sehingga volume sump yang di buat sebesar 225 m³, untuk debit air total untuk paritan 0,0237 m³/detik sehingga volume paritan yang di buat sebesar 0,228 m³. date: 2022-02-11 date_type: completed official_url: https://www.repository.itny.ac.id full_text_status: restricted institution: Institut Teknologi Nasional Yogyakarta department: Fakultas Teknik dan Perencanaan : Teknik Pertambangan thesis_type: other thesis_name: other referencetext: Ambarwati, RD, S.T., M.T, 2018 Hidrologi dan Hidrolika. https://dsdap.bantenprov.go.id/upload/Advetorial/1.%201820Pengertian %20Hidrologi%20dan%20Siklus%20Hidrologi%20RDA_EDITOR.pdf ( 23 Juli 2021 pukul 19.35 WIB) Anonim, 2016, Laporan Hasil Eksplorasi, CV. Anugerah Bumi Cilacap, Cilacap, Jawa Tengah. Anonim, 2016, Laporan Studi Kelayakan, CV. Anugerah Bumi Cilacap, Cilacap, Jawa Tengah. Asikin, S., Handoyo, A., Prastistho, B., 1992. Peta Geologi Lembar Banyumas, Jawa. Pusat Penelitian dan Pengembangan Geologi. Bandung. Atok, R, A, E, Adnyano A.A, I, A., Rancangan Saluran Terbuka Pada Sistem Penyaliran Tambang di PT. Hasnur Riung Sinergi Jobsite PT. Bhumi Rantau Energi, Kabupaten Tapin, Provinsi Kalimanta Selatan. Jurnal Teknik Sipil, Volume 15, No. 4, April 2020 : 235-239 Bastian, D, 2021, Bagian-bagian Dari Geometri Penampang Saluran. https://www.sarjanasipil.my.id/2016/11/bagian-bagian-darigeometri penampang.html#:~:text=h.%20Faktor%20penampang%20%2C%20Z %20(,dan%20akar%20dari%20kedalaman%20hydraulic. Cahyadi, TA., dkk. (2020). Evaluasi Saluran Terbuka Dengan Menggunakan Distribusi Gumbell, 5(1), 29-36Endhrianto. Cahyadi, TA, Jeragustivia, B, Anton, S,Rancangan Sistem Penyaliran Pada Lokasi Disposal Tambang Nikel., Dengan Persamaan (Gumbel, 1941), Rumus mononbe (Sosrodarsono dan Takeda, 1983), rumus manning (King, 1918). file:///C:/Users/HP/Downloads/download%20baru/garuda1051395.pd f Chay Asdak C, 2004, Hidrologi dan Pengelolaan Daerah Aliran Sungai, Gadjah Mada University Press, Yogyakarta. https://www.gopracticals.com/civil/hydraulics/efficiencyreciprocatingpump/ (20 Maret 2021 pukul 19.20 WIB) Gautama, R. S, 1990-1993, Sistem penirisan tambagn kursus pengawas tambang dan Pengantar Penirisan Tambang,Institut Teknologi Bandung, Bandung. Gautama, R. S., 1999, Diktat Kuliah Sitem Penyaliran Tambang, Jurusan Teknik Pertambangan, Fakultas Tenologi Mineral, Intitut Teknologi Bandung. Gautama, R. S., 2019, Sistem Penyaliran Tambang, Institut Teknologi Bandung,Bandung Gumbel, E.J., 1941, The Return Period of Flood Flows. Ann. Math.Statist. https://www.scirp.org/(S(i43dyn45teexjx455qlt3d2q))/reference/Referen cesPapers.aspx?ReferenceID=912680 Genevraye, P., & Samuel, L. (1972). Geology of the Kendeng zone (Central & east Java). Kastowo dan Suwarna, N. 1996. Peta Geologi Lembar Majenang ,Jawa. Bandung: Pusat Penelitian dan Pengembangan Geologi. Kepmen ESDM 1827 Thn. 2018., tentang PEDOMAN PELAKSANAAN KAIDAH TEKNIK PERTAMBANGAN YANG BAIK., Hal. 95 Point Pengelolaan air tambang. Listianty, N., 2017. Dampak Pertambangan Terhadap Lingkungan Hidup Di Kalimantan Selatan dan Implikasi Bagi Hak-hak Warga Negara. Al-Adl: Jurnal Hukum. Martodjojo, S., dan Pulunggono, A., 1994. Perubahan tektonik Paleogen – Neogen merupakan peristiwa terpenting di Jawa. Proccedings Geologi dan Geotektonik Pulau Jawa: 37-50. M. Djuri, H. Samodra, T.C. Amin & S. Gafoer (1996) Dalam Peta Geologi Lembar Purwokerto - Tegal dan Banyumas. Simanjuntak, T.O., dan Surono, 1992. Peta Geologi Lembar Pangandaran, Jawa. Pusat Penelitian dan Pengembangan Geologi (P3G). Bandung Suyono, S dan Takeda, Kensaku,1983 Hidrologi untuk Pengairan, PT. Prandya Paramita, Jakarta. Sularso,. Tahara. H., 1982 Pompa dan Kompresor, (Pemilihan, Pemakaian Dan Pemeliharan) Jakarta: Pradnya Paramita, Syahputra, Zulfan, Vol 4, No2, 2016. Perhitungan dimensi saluran drainase https://garuda.ristekbrin.go.id/documents/detail/552978 Tanika dkk, 2016., Buku Pengelolaan Daerah Aliran Sungai dan Aplikasi Dalam Proses Belajar Mengajar, disusun oleh (Naharuddin, M.Si.). Van Bemmelen, 1949, The Geology Of Indonesia, Government Printing Oficce, The Hague Van Zuidam, et, al 1983. Guide to Geomorphologic aerial photographic interpretation and mampping. Yunus Ashari., 2011, Diktat Kuliah sistem penirisan Tambang, Tentang Siklus Hidrologi http://repository.unisba.ac.id/bitstream/handle/4129/06bab3_Ardi%20G unawan_10070110088_skr_2016.pdf?sequence=6&isAllowed=y citation: BAHY, MUHAMMAD NAUVAL (2022) Kajian teknis sistem penyaliran tambang dengan mine dewatering pada tambang andesit di CV. Anugerah Bumi Cilacap dusun Bulupayung, kecamatan Kesugihan, kabupaten Cilacap, Jawa Tengah. Other thesis, Institut Teknologi Nasional Yogyakarta. document_url: https://repository.itny.ac.id/id/eprint/5745/1/COVER%201.pdf document_url: https://repository.itny.ac.id/id/eprint/5745/2/BAB%20I.pdf document_url: https://repository.itny.ac.id/id/eprint/5745/3/BAB%20II.pdf document_url: https://repository.itny.ac.id/id/eprint/5745/4/BAB%20III.pdf document_url: https://repository.itny.ac.id/id/eprint/5745/5/BAB%20IV.pdf document_url: https://repository.itny.ac.id/id/eprint/5745/6/BAB%20V.pdf document_url: https://repository.itny.ac.id/id/eprint/5745/7/BAB%20VI%20KESIMPULAN%20DAN%20DAFTAR%20PUSTAKA.pdf document_url: https://repository.itny.ac.id/id/eprint/5745/8/JURNAL%20IJHES.pdf document_url: https://repository.itny.ac.id/id/eprint/5745/9/DAFTAR%20PUSTAKA.pdf document_url: https://repository.itny.ac.id/id/eprint/5745/10/LAMPIRAN.pdf