eprintid: 5642 rev_number: 17 eprint_status: archive userid: 343 dir: disk0/00/00/56/42 datestamp: 2024-11-15 02:42:25 lastmod: 2024-11-15 02:42:25 status_changed: 2024-11-15 02:42:25 type: thesis metadata_visibility: show creators_name: WERDININGSIH, DANA IKA contributors_type: http://www.loc.gov/loc.terms/relators/THS contributors_type: http://www.loc.gov/loc.terms/relators/THS contributors_name: Sari, Laura Puspita contributors_name: Adnyano, A.A. Inung Arie title: Kajian kondisi pengaruh tempat kerja terhadap produktivitas alat mekanis pada kegiatan penambangan batu gamping di PT Arsa Mulia Sukses Kabupaten Sukabumi ispublished: unpub subjects: TN divisions: teknik_pertambangan keywords: Mechanical Tool, Productivity, Availability and use of tools = Alat Mekanis, Produktivitas, Kesediaan dan penggunaan alat abstract: The problem that occurs at PT Arsa Mulia Sukses is that the production of loading equipment and transportation equipment has not been fulfilled so that the production target has not been achieved. The factors that affect the performance of mechanical equipment so that the expected production target cannot be achieved are the type of material, the condition of the mining front, haul road geometry, climate, loading pattern, and haul road distance. Based on the calculation results, the productivity of loading equipment during the dry season is only able to reach 1,122.38 tons/day and transportation equipment of 845.48 tons/day, while during the rainy season it is 438.96 tons/day and transportation equipment is 384, 57 tons/day, so it is necessary to make improvements to the factors that affect the performance of mechanical equipment so that the expected production target can be achieved. Efforts to increase production are carried out by increasing work efficiency, improving tool cycle times, and reducing the number of conveyances. The improvements that have been made will have an impact on the production of mechanical equipment, so that the production of mechanical equipment during the dry season can increase to 1,477.62 tons/day, and the production of mechanical equipment during the rainy season to 1,402.71 tons/day, so that the expected production target company can be achieved = Permasalahan yang terjadi pada PT arsa mulia sukses adalah belum terpenuhinya produksi dari alat muat dan alat angkut sehingga target produksi belum tercapai. Adapun faktor-faktor yang mempengaruhi kinerja alat mekanis sehingga target produksi yang diharapkan tidak dapat tercapai yaitu jenis material, kondisi front penambangan, geometri jalan angkut, iklim, pola muat, dan jarak jalan angkut. Berdasarkan hasil perhitungan yang diperoleh produktivitas alat muat pada saat musim kemarau hanya mampu mencapai 1.122,38 ton/hari dan alat angkut sebesar 845,48 ton/hari, sedangkan pada saat musim hujan sebesar 438,96 ton/hari dan alat angkut sebesar 384,57 ton/hari, sehingga perlu dilakukan perbaikan terhadap faktor – faktor yang mempengaruhi kinerja alat mekanis sehingga target produksi yang diharapkan dapat tercapai. Upaya peningkatan produksi dilakukan dengan cara peningkatan efisiensi kerja, memperbaiki waktu edar alat, dan mengurangi jumlah alat angkut. Perbaikan yang sudah dilakukan akan berdampak pada produksi alat mekanis, sehingga produksi alat mekanis pada saat musim kemarau dapat meningkat menjadi 1.477,62 ton/hari, dan produksi alat mekanis pada saat musim hujan menjadi 1.402,71 ton/hari, sehingga target produksi yang diharapkan perusahaan dapat tercapai. date: 2022-08 date_type: completed official_url: https://repository.itny.ac.id full_text_status: restricted institution: Institut Teknologi Nasional Yogyakarta department: Fakultas Teknik dan Perencanaan : Teknik Pertambangan thesis_type: other thesis_name: other referencetext: [1]Alfarizi1, Moch Aufa. dkk. 2020. Hubungan Physical Availability Dan Used Of Availability Terhadap Overburden Removal Di Pt Semesta Centramas. Universitas Lambung Mangkurat. [2] Almeida, Efigenia. Maia. Alves. 2011. Kajian teknis alat gali muat dan alat angkut dalam upaya memenuhi sasaran produksi pengupasan lapisan tanah penutup pada penambangan batubara di PT. Yustika utama energi Kalimantan Timur. UPN Veteran, Yogyakarta. [3]Anaperta, Yoszi Mingsi. Evaluasi Keserasian (Match Factor) Alat Muat Dan Alat Angkut Dengan Metode Control Chart (Peta Kendali) Pada Aktivitas Penambangan Di PIT X PT Y. Vol. 9, No. 1, April 2016. Jurnal Teknologi Informasi & Pendidikan. [4]Asri, Yuli. dkk. 2019. Optimalisasi Alat Gali-Muat Dan Alat Angkut Terhadap Produksi Overburden Dengan Metode Kapasitas Produksi Dan Metode Antrian Di Pit Timur Periode Agustus 2017 PT. Artamulia Tata Pratama, Site Tanjung Belit, Bungo, Jambi. Jurnal Bina Tambang. Universitas Negeri Padang. [5] Anisari, Rezky. 2012. Keserasian Alat Muat Dan Angkut Untuk Kecapaian Target Produksi Pengupasan Batuan Penutup Pada Pt. Adaro Indonesia Kalimantan Selatan. Volume 4, No. 1, Juni 2012 : 19-23. Jurnal POROS TEKNIK. [6] Burt, Chistina. dkk. 2013. Equipment Selection for Surface Mining: A Review. July 19, 2013. Draft paper. [7] Fauzi, M. Restiano. dkk. 2019. Kajian Kesediaan Alat Mekanis pada Operasi Penambangan Batu Andesit di PT Mandiri Sejahtera Sentra Kecamatan Tegalwaru, Kabupaten Purwakarta Provinsi Jawa Barat. Universitas Islam Bandung. [8] Herlita, Padent. dkk. 2018. Analisis Kebutuhan Alat Muat dan Alat Angkut Pada Kegiatan Penambangan Soil di Area 242 Dengan Penerapan Metoda Antrian Untuk Memenuhi Target Produksi Clay 3000 ton/hari. Jurnal Bina Tambang. Jurnal Bina Tambang, Volume 3, No. 3. Universitas Negeri Padang. [9] Indonesianto, Y. 2018, Pemindahan Tanah Mekanis, Jurusan Teknik Pertambangan, Sekolah Tinggi Teknologi Nasional, Yogyakarta. [10] Pratama, Gindang Rain. 2014. Kajian Teknis Produktivitas Alat Gali Muat Dan Alat Angkut Pada Pemindahan Overburden PT. Kalimantan Prima Persada Site Mass Asam-Asam Provinsi Kalimantan Selatan. September 2014. Universitas Lambung Mangkurat. citation: WERDININGSIH, DANA IKA (2022) Kajian kondisi pengaruh tempat kerja terhadap produktivitas alat mekanis pada kegiatan penambangan batu gamping di PT Arsa Mulia Sukses Kabupaten Sukabumi. Other thesis, Institut Teknologi Nasional Yogyakarta. document_url: https://repository.itny.ac.id/id/eprint/5642/1/COVER_compressed.pdf document_url: https://repository.itny.ac.id/id/eprint/5642/2/BAB%20I_compressed.pdf document_url: https://repository.itny.ac.id/id/eprint/5642/3/BAB%20II_compressed.pdf document_url: https://repository.itny.ac.id/id/eprint/5642/4/BAB%20III_compressed.pdf document_url: https://repository.itny.ac.id/id/eprint/5642/5/BAB%20IV_compressed.pdf document_url: https://repository.itny.ac.id/id/eprint/5642/6/BAB%20V_compressed.pdf document_url: https://repository.itny.ac.id/id/eprint/5642/7/BAB%20VI_compressed.pdf document_url: https://repository.itny.ac.id/id/eprint/5642/8/JURNAL%20710017216.pdf document_url: https://repository.itny.ac.id/id/eprint/5642/9/DAFTAR%20PUSTAKA_compressed.pdf document_url: https://repository.itny.ac.id/id/eprint/5642/10/LAMPIRAN_compressed.pdf