eprintid: 5405 rev_number: 17 eprint_status: archive userid: 343 dir: disk0/00/00/54/05 datestamp: 2024-09-30 03:28:33 lastmod: 2024-09-30 03:28:33 status_changed: 2024-09-30 03:28:33 type: thesis metadata_visibility: show creators_name: ARIFIN, ANDIKA NUR contributors_type: http://www.loc.gov/loc.terms/relators/THS contributors_type: http://www.loc.gov/loc.terms/relators/THS contributors_name: ., Supandi contributors_name: Mohamad, Mustapa Ali title: Kajian teknis unit peremuk batu andesit untuk memenuhi target produksi PT. Batu Mulyo Berjaya Desa Pesanggrahan Kec. Kesugihan kab. Cilacap Prov. Jawa Tengah ispublished: unpub subjects: TN divisions: teknik_pertambangan keywords: Crusher, Production, Effectiveness = Crusher, Produksi, Efektifitas abstract: PT. Batu Mulyo Berjaya is a private company engaged in the crushing of andesite. Andesite stone crusher plant is located in Pesanggrahan Village, Kesugihan District, Cilacap regency, Central Java province. This study was conducted to determine the technical factors that can result in the production target of the jaw crusher series of 320 tons / day is not achieved, and provide alternative improvements to achieve production targets in the processing of andesite. The research method used is the study of literature, field observations and data collection. The production produced is currently 35.53 tons / hour or 227.53 tons / day, with the effectiveness of primary jaw crusher crushing equipment of 48.76% and secondary jaw crusher 43.18%. With the results of the final product is the fraction -30 + 20 mm of 9.59 tons/hour , fraction -20 + 10 mm of 5.51 tons/hour, fraction -10 + 5 of 1.59 tons/hour, fraction -5 of 2.04 tons / hour. Efforts to increase productivity is done by pressing the existing time constraints to 116.08 minutes with effective time to 7.07 hours / day. Obtained final product fraction -30 + 20 mm of 13.25 tons/hour, fraction -20 + 10 mm of 8.51 tons/hour, -10 + 5 mm of 2.15 tons/hour, fraction -5 mm of 3.63 tons / hour = PT. Batu Mulyo Berjaya merupakan sebuah perusahaan swasta yang bergerak di bidang peremukan batu andesit. Pabrik peremuk batu andesit terletak di Desa Pesanggrahan, Kecamatan Kesugihan, Kabupaten Cilacap, Provinsi Jawa Tengah. Penelitian ini dilakukan untuk mengetahui faktor-faktor teknis yang dapat mengakibatkan target produksi pada rangkaian jaw crusher sebesar 320 ton/hari tidak tercapai, dan memberikan alternatif perbaikan untuk mencapai target produksi pada pengolahan batu andesit. Adapun metode penelitian yang digunakan yaitu dengan studi literatur, observasi lapangan dan pengambilan data. Produksi yang dihasilkan saat ini 35,53 ton/jam atau 227,53 ton/hari, dengan efektivitas alat peremuk jaw crusher primer sebesar 48,76% dan jaw crusher sekunder 43,18%. Dengan hasil produk akhirnya yaitu fraksi -30 + 20 mm sebesar 9,59 ton/jam , fraksi -20 + 10 mm sebesar 5,51 ton/jam, fraksi -10 + 5 sebesar 1,59 ton/jam, fraksi -5 sebesar 2,04 ton/jam. Upaya peningkatan produktivitas dilakukan dengan cara menekan waktu hambatan yang ada menjadi 116,08 menit dengan waktu efektif menjadi 7,07 jam/hari. Diperoleh hasil akhir produk fraksi -30 + 20 mm sebesar 13,25 ton/jam, fraksi -20 + 10 mm sebesar 8,51 ton/jam, -10 + 5 mm sebesar 2,15 ton/jam, fraksi -5 mm sebesar 3,63 ton/jam. date: 2023-01 date_type: completed full_text_status: restricted institution: Institut Teknologi Nasional Yogyakarta department: Fakultas Teknik dan Perencanaan : Teknik Pertambangan thesis_type: other thesis_name: other referencetext: Currie, J.M., 1973, Unit Operation in Mineral Processing, CSM Press, British Colombia. Firmansyah, Pandu., 2018, Kajian Teknis Unit Peremuk Andesit Untuk Memenuhi Kebutuhan Agregat di P.T. Cakrawala Semesta Perkasa Site Sikasur Belik Pemalang Jawa Tengah, Perpustakaan UPN “Veteran” Yogyakarta. Gaudin, A.M., 1939, Principles of Mineral Dressing, Mc Graw Hill Book Company, New York. Partanto Prodjosumarto., 1995, Pemindahan Tanah Mekanis, Diktat Kuliah, Jurusan Teknik Pertambangan ITB, 204 halaman. Peurifoy, R.L., 1986, Construction Planning, Equipment and Methode, Fourth Edition, Mc Graw Hill Book Company, New York. Peurifoy, R.L., 1988, Perencanaan, Peralatan, dan Metode Kontruksi, Edisi 4, P.T. Erlangga, Jakarta. Putra, Jovian Addo., 2019, Kajian Teknis Unit Peremuk Dengan Kapasitas 100 Ton Perjam di P.T. Windoe Mitra Utama Kecamatan Nanggulan Kabupaten Kulonprogo Daerah Istimewa Yogyakarta, Perpustakaan UPN “Veteran” Yogyakarta. Justoperator,2011, Belt Conveyor, https://justoperator.wordpress.com//, diakses pada 25 Juni 2021 Pukul 23.00. Susan, Emi., 2015, Pengertian Belt Conveyor, Diakses Pada https://www.scribd .com/doc/271321014/. Keputusan Mentri Energi dan Sumber Daya Mineral 1827 k / 30 / MEM / 2018. Taggart, A.F., 1953, Handbook of Mineral Dressing, John Willey and Son, New York. Wills, B.A., 1979, Mineral Processing Technology, 1th Edition, Pargamen Press, New York. Wills B.A. dan Minm T.J.N., 2016, Mineral Processing Technology, Eighth Edition, Queensland, Elsevier Science & Technology Books, Hal 108-117. Denna, P.R.S, 2019, Kajian Teknis Produktivitas Unit Peremuk Batu Andesit di PT.Gawi Maju Karsa Kabupaten Purworejo Provinsi Jawa Tengah, Jurusan Teknik Pertambangan UPN Veteran Yogyakarta. Cahya, R.N, dkk., 2020, Kajian Kinerja Unit Crushing Plant Batu Andesit PT. Sumber Gunung Maju, Jurnal Pertambangan, Vol. 04 No. 01. Svedensten P., Evertsson M., (2004), Crushing plant optimization via a genetic evolutionary algorhytm, Minerals Engineering, Vol. 18. Hal 473-479 Normansyah, Pulungan, L., & Nasrudin, D. 2015. Optimalisasi Alat Crushing Plant untuk Memenuhi Target Produksi Andesit Di PT . Ansar Terang Crushindo , Kecamatan Pangkalan Kota. 2(1), 139–147. Munandar, F. A., Sriyanti, & Yuliadi. 2015. Evaluasi Kinerja Unit Crushing Plant Batu Andesit Pada PT Silva Andia Utama Di Desa Giri Asih , Kecamatan Batujajar , Kabupaten Bandung , Provinsi Jawa Barat. 4(1), 486–494. citation: ARIFIN, ANDIKA NUR (2023) Kajian teknis unit peremuk batu andesit untuk memenuhi target produksi PT. Batu Mulyo Berjaya Desa Pesanggrahan Kec. Kesugihan kab. Cilacap Prov. Jawa Tengah. Other thesis, Institut Teknologi Nasional Yogyakarta. document_url: https://repository.itny.ac.id/id/eprint/5405/1/COVER_merged%20%2814%29.pdf document_url: https://repository.itny.ac.id/id/eprint/5405/2/BAB%20I.pdf document_url: https://repository.itny.ac.id/id/eprint/5405/3/BAB%20II.pdf document_url: https://repository.itny.ac.id/id/eprint/5405/4/BAB%20III.pdf document_url: https://repository.itny.ac.id/id/eprint/5405/5/BAB%20IV.pdf document_url: https://repository.itny.ac.id/id/eprint/5405/6/BAB%20V.pdf document_url: https://repository.itny.ac.id/id/eprint/5405/7/BAB%20VI.pdf document_url: https://repository.itny.ac.id/id/eprint/5405/8/KAJIAN%20TEKNIS%20UNIT%20PEREMUK%20BATU%20ANDESIT%20UNTUK%20MEMENUHI%20TARGET%20PRODUKSI%20PT.%20BATU%20MULYO%20BERJAYA%20DES.pdf document_url: https://repository.itny.ac.id/id/eprint/5405/9/DAFTAR%20PUSTAKA.pdf document_url: https://repository.itny.ac.id/id/eprint/5405/10/LAMPIRAN.pdf