eprintid: 5367 rev_number: 17 eprint_status: archive userid: 343 dir: disk0/00/00/53/67 datestamp: 2024-09-26 02:40:08 lastmod: 2024-09-26 02:40:08 status_changed: 2024-09-26 02:40:08 type: thesis metadata_visibility: show creators_name: NOOR, AHMAD WAHDIAN contributors_type: http://www.loc.gov/loc.terms/relators/THS contributors_type: http://www.loc.gov/loc.terms/relators/THS contributors_name: ., Supandi contributors_name: Sidiq, Hidayatullah title: Rancangan teknis pushback penambangan batu bara di PIT Block 01 PT. Borneo Alam Semesta Site Binuang Mitra Bersama Kecamatan Lokpaikat Kabupaten Tapin Provinsi Kalimantan Selatan ispublished: unpub subjects: TN divisions: teknik_pertambangan keywords: Stripping Ratio, Production Scheduling, Mine Life = Stripping Ratio, Penjadwalan Produksi, Umur Tambang abstract: PT. Borneo Alam Semesta is a national private company engaged in coal mining contracting at PT. Binuang Mitra Bersama which is located in Budimulya Village, Lopaikat District, Tapin Regency, South Kalimantan Province. PT. Binuang Mitra Bersama as the owner has a production operation mining permit (IUP) covering an area of 537,48 Ha. PT. Binuang Mitra Bersama requires an annual production target of ± 850.000 tons with an average stripping ratio of ± 4:1 according to a predetermined target. Based on the annual mine progress plan that has been made and from the results of volume calculations in the pit, an estimated mining life of pit bmb block 01 is 3 years 4 months with an average number of loading and unloading equipment per year of ± 6 units. In the first year of mining the volume of overburden uncovered was 3.547.795 Bcm and coal was 857.301 tons. In the second year of mining the volume of overburden uncovered was 3.531.342 Bcm and coal was 860.745 tons. In the third year of mining the volume of overburden uncovered was 3.427.688 Bcm and coal was 879.663 tonnes. and in mining in the last year the volume of overburden uncovered was 865.238 Bcm and coal was 324.643 tons = PT. Borneo Alam Semesta merupakan perusahaan swasta nasional yang bergerak dibidang kontraktor penambangan batubara di PT. Binuang Mitra Bersama yang terletak didesa budimulya, kecamatan lokpaikat, kabupaten tapin, provinsi kalimantan selatan. PT. Binuang Mitra Bersama selaku owner memiliki izin usaha penambangan (IUP) Operasi produksi seluas 537,48 Ha. PT. Binuang Mitra Bersama membutuhkan target produksi pertahun sebesar ± 850.000 ton dengan rata – rata stripping ratio ± 4:1 sesuai target yang telah ditetapkan. Berdasarkan rancangan kemajuan tambang pertahun yang telah dibuat dan dari hasil perhitungan volume di pit maka di dapat estimasi umur tambang pit bmb block 01 yaitu adalah 3 tahun 4 bulan dengan rata- rata jumlah alat gali muat pertahun sebesar ± 6 units . Pada penambangan tahun pertama volume overburden yang terbongkar sebesar 3.547.795 Bcm dan batubara sebesar 857.301 Ton. Pada penambangan tahun kedua volume overburden yang terbongkar sebesar 3.531.342 Bcm dan batubara sebesar 860.745 Ton. Pada penambangan tahun ketiga volume overburden yang terbongkar sebesar 3.427.688 Bcm dan batubara sebesar 879.663 Ton. dan pada penambangan didalam tahun terakhir volume overburden yang terbongkar sebesar 865.238 Bcm dan batubara sebesar 324.643 Ton. date: 2023-01-27 date_type: completed full_text_status: restricted institution: Institut Teknologi Nasional Yogyakarta department: Fakultas Teknik dan Perencanaan : Teknik Pertambangan thesis_type: other thesis_name: other referencetext: Aastho (American Association of State Highway and Transportation Officials): Penentuan lebar jalan angkut minimum untuk jalan lurus. H.l Hartman, 1987:Tiga faktor utama yang mempengaruhi perencanaan. Hustrulid, W. & Kuchta, M., (1995), “Open Pit Mine Planning and Design : Vol. 1-Fundamentals”, AA Balkema, Netherland Keputusan Menteri Energi dan Sumber Daya Mineral (ESDM) Republik Indonesia Nomor 1827/K/30/MEM/2018 Tentang Pedoman Pelaksanaan Kaidah Teknik Pertambangan yang Baik” Menteri Energi Sumber Daya Mineral Republik Indonesia Mathieson, 1982: Kepentingan dan pengembangan tahapan penambangan yang optimal dan penjadwalan produksi selama umur tambang. Morrison dan rusel, 1973; boshkov dan wright, 1973, Aturan utama untuk mencapai ongkos rendah dan keuntungan yang maximum. Prodjosumarto, P. 1993. Mine supevisior course: Pemindahan tanah mekanis. Robert, Hook dan Fish,1972, rekomendasi kemiringan dan kedalaman lereng Sidiq, H., 2018, Perancangan Desain Tambang, Jurusan Teknik Pertambangan Institut Teknologi Nasional Yogyakarta. Silvia Sukirman, 1994:Dasar-dasar Perencanaan Geometrik Jalan, Radius tikungan truck dan radius tikungan minimum Sukandarrumidi,1995 :Endapan relatif datar dekat dengan permukaan tanah. Walton & Atkinson 1978, membentuk lereng dengan kemiringan dan pemilihan alat yang tepat Waterman Sulistyana, 2010, “Perencanaan Tambang”, Jurusan Teknik Pertambangan, UPN “Veteran” Yogyakarta, Yogyakarta. William Hustrulid & Mark Kuchta .,Open Pit Mine Planning & Design ,(1995): Prisma- prisma triangular citation: NOOR, AHMAD WAHDIAN (2023) Rancangan teknis pushback penambangan batu bara di PIT Block 01 PT. Borneo Alam Semesta Site Binuang Mitra Bersama Kecamatan Lokpaikat Kabupaten Tapin Provinsi Kalimantan Selatan. Other thesis, Institut Teknologi Nasional Yogyakarta. document_url: https://repository.itny.ac.id/id/eprint/5367/1/ilovepdf_merged%20%2884%29.pdf document_url: https://repository.itny.ac.id/id/eprint/5367/2/BAB%20I.pdf document_url: https://repository.itny.ac.id/id/eprint/5367/3/BAB%20II.pdf document_url: https://repository.itny.ac.id/id/eprint/5367/4/BAB%20III.pdf document_url: https://repository.itny.ac.id/id/eprint/5367/5/BAB%20IV.pdf document_url: https://repository.itny.ac.id/id/eprint/5367/6/BAB%20V.pdf document_url: https://repository.itny.ac.id/id/eprint/5367/7/BAB%20VI.pdf document_url: https://repository.itny.ac.id/id/eprint/5367/8/JURNAL%20AHMAD%20WAHDIAN%20NOOR%20712218253.pdf document_url: https://repository.itny.ac.id/id/eprint/5367/9/DAFTAR%20PUSTAKA.pdf document_url: https://repository.itny.ac.id/id/eprint/5367/10/LAMPIRAN%20LENGKAP.pdf