eprintid: 5307 rev_number: 17 eprint_status: archive userid: 343 dir: disk0/00/00/53/07 datestamp: 2024-09-23 06:42:18 lastmod: 2024-09-23 06:42:18 status_changed: 2024-09-23 06:42:18 type: thesis metadata_visibility: show creators_name: WIDODO, ANDREAN YOGATAMA ARDY contributors_type: http://www.loc.gov/loc.terms/relators/THS contributors_type: http://www.loc.gov/loc.terms/relators/THS contributors_name: ., Supandi contributors_name: Sumarjono, Erry title: Kajian teknis produktivitas pengeboran lubang ledak pada tambang andesit PT. Gunung Puncak Salam, Kabupaten Bandung Provinsi Jawa Barat ispublished: unpub subjects: TN divisions: teknik_pertambangan keywords: work efficiency, cycle time, drilling rate, equivalent volume, productivity = efisiensi kerja, waktu edar, laju pengeboran, volume setara, produktivitas abstract: PT. Gunung Puncak Salam is a company engaged in andesite mining that located in Cikuya Village, Lagadar Village, Margaasih District, Bandung Regency, West Java. One of the stages of mining carried out at PT. Gunung Puncak Salam is rock demolition by drilling using a mechanical tools CRD Furukawa PCR-200. The production target set by the company from the drilling unit is 800 m3/day. This research was conducted to determine the productivity of the drilling machine used, to identify the causes of not achieving production targets, as well as to examine efforts that can be made to increase drilling productivity. The results of observations made in the field on the Furukawa PCR-200 Crawler Rock Drill type obtained a work efficiency value of 52.10%, the actual drilling rate was 0.55 meters/minute, the average circulation time was 10.93 minutes/hole and the equivalent volume was 5 m3/m, so the result of drilling production was 707.81 m3/day. With this result, the target of the company from the drilling unit cannot be fulfilled. Then the work efficiency was improved by reducing the loose time and the work efficiency was increased from 52.10% to 71.16%, and the drilling rate was improved by increasing the rotational speed from the actual rotational speed of 101.43 rpm and increased to the optimal rotational speed of 110 rpm so that the drilling rate after repair was 0.60 meters/minute. From the improvements made to the work efficiency and drilling rate, the drilling production increased to 1056.75 m3/day. These results have been able to meet the company's target of 800 m3/day = PT. Gunung Puncak Salam merupakan perusahaan yang bergerak di bidang pertambangan batu andesit yang berlokasi di wilayah Kampung Cikuya, Desa Lagadar, Kecamatan Margaasih, Kabupaten Bandung, Jawa Barat. Salah satu tahapan penambangan yang dilakukan di PT. Gunung Puncak Salam adalah pembongkaran batuan dengan cara pengeboran menggunakan alat mekanis CRD Furukawa PCR-200. Target produksi yang telah ditetapkan oleh perusahaan dari unit pengeboran adalah 800 m3/hari. Penelitian ini dilakukan untuk mengetahui produktivitas mesin bor yang digunakan, mengidentifikasi penyebab tidak tercapainya target produksi yang ditetapkan oleh perusahaan, serta mengkaji upaya yang dapat dilakukan untuk meningkatkan produktivitas pengeboran. Hasil pengamatan yang dilakukan di lapangan pada mesin bor berjenis Crawler Rock Drill Furukawa PCR-200 didapatkan nilai efisiensi kerja 52,10%, laju pengeboran aktual sebesar 0,55 meter/menit, waktu edar rata-rata adalah 10,93 menit/lubang serta volume setara 5 m3/m, maka produksi pengeboran yang dihasilkan sebesar 707,81 m3/hari. Dengan hasil ini, target dari perusahaan dari unit pengeboran belum dapat terpenuhi. Maka dilakukan perbaikan terhadap efisiensi kerja dengan menekan waktu hambatan dan didapatkan peningkatan efisiensi kerja dari 52,10% menjadi 71,16%, serta dilakukan perbaikan terhadap laju pengeboran dengan menaikkan kecepatan rotasi dari kecepatan rotasi aktualnya sebesar 101,43 rpm dan dinaikkan pada kecepatan rotasi optimalnya sebesar 110 rpm sehingga didapatkan laju pengeboran setelah perbaikan menjadi 0,60 meter/menit. Dari perbaikan yang dilakukan terhadap efisiensi kerja dan laju pengeborannya, sehingga didapatkan produksi pengeboran meningkat menjadi sebesar 1056,75 m3/hari. Hasil ini sudah mampu memenuhi target dari perusahaan sebesar 800 m3/hari. date: 2023-07-20 date_type: completed full_text_status: restricted institution: Institut Teknologi Nasional Yogyakarta department: Fakultas Teknik dan Perencanaan : Teknik Pertambangan thesis_type: other thesis_name: other referencetext: Ash, R. L. 1990. Design Of Blasting Round, ”Surface Mining” B.A kennedy Editor, society for mining, Metallurgy, and exploration. Bemmelen, R.W van. 1949. The Geology Indonesia Volume 1. Amsterdam : The Hague Martinus. Bieniawski, Z.T., 1989. Engineering Rock Mass Classification. Canada : Jhon Wiley & Sons, inc. Deere, D.U., 1966. Engineering Classification and Index Properties for Intact Rock. New Mexico : Air Force Weapons Laboratory Indonesianto, Yanto. 2020. Pemindahan Tanah Mekanis. Yogyakarta : Program Studi Teknik Pertambangan, Fakultas Teknologi Mineral, Institut Teknologi Nasional Yogyakarta. Jaya, I Made Laut Mertha. 2020. Penelitian Kuantitatif dan Kualitatif : Teori, Penerapan, dan Riset Nyata. Yogyakarta : Anak Hebat Indonesia Jimeno, C. Lopez, etc. 1995. Drilling and Blasting of Rocks, A.A.Balkema publishers, Rotterdam, Netherlands. Koesnaryo, S. 1988. Teknik Pengeboran dan Peledakan. Yogyakarta : Jurusan Teknik Pertambangan, Fakultas Teknologi Mineral, Universitas Pembangunan Nasional “Veteran” Yogyakarta. Koesnaryo, S. 2001. Pengeboran Untuk Penyedian Lubang Ledak. Yogyakarta : Jurusan Teknik Pertambangan, Fakultas Teknologi Mineral, Universitas Pembangunan Nasional “Veteran” Yogyakarta. Konya, C. J. and Walter, E. J. 1990. Surface Blast Design. New Jersey : Prentice Hall, Englewood Cliffs, Seismological Observatory, John Carroll University. Martodjojo, Soejono. 1984. Evolusi Cekungan Bogor Jawa Barat Vol: 1. Jawa Barat : Fakultas Pasca Sarjana, Institut Teknologi Bandung, Indonesia. Martodjojo, Soejono. 2003. Evolusi Cekungan Bogor. Jawa Barat : Institut Teknologi Bandung Press, Indonesia. McGregor, K. 1967. The Drilling of Rocks. London : CR Books Ltd, A Mclaren Company. Pulunggono, A. & Martodjojo, S. 1994. Proceedings Geologi dan Geoteknik Pulau Jawa : Perubahan Tektonik Paleogene – Neogene Merupakan Peristiwa Tektonik Terpenting di Jawa (hal. 37 – 50). Yogyakarta : Penerbit NAFIRI 69 Saptono, S. 2006. Teknik Pengeboran dan Peledakan. Yogyakarta : Jurusan Teknik Pertambangan, Fakultas Teknologi Mineral, Universitas Pembangunan Nasional “Veteran” Yogyakarta. Strauss, Anselm dan Corbin, Yuliet. 2007. Dasar – Dasar Penelitian Kualitatif : Tatalangkah dan Teknik – Teknik Teoritis Data. Yogyakarta : Pustaka Pelajar. Sudjatmiko. 2003. Peta Geologi Lembah Cianjur. Jawa Barat : Pusat Penelitian dan Pengembangan Geologi Weatherspark. 2022. Iklim dan Cuaca Rata – Rata Sepanjang Tahun di Kota Bandung. (https://id.weatherspark.com/y/118121/Cuaca-Rata-ratapada-bulan-in-Kota-Bandung-Indonesia-Sepanjang-Tahun) citation: WIDODO, ANDREAN YOGATAMA ARDY (2023) Kajian teknis produktivitas pengeboran lubang ledak pada tambang andesit PT. Gunung Puncak Salam, Kabupaten Bandung Provinsi Jawa Barat. Other thesis, Institut Teknologi Nasional Yogyakarta. document_url: https://repository.itny.ac.id/id/eprint/5307/1/1.%20COVER%20-%20DAFTAR%20LAMPIRAN.pdf document_url: https://repository.itny.ac.id/id/eprint/5307/2/2.%20BAB%20I%20-%20Pendahuluan.pdf document_url: https://repository.itny.ac.id/id/eprint/5307/3/3.%20BAB%20II%20-%20Tinjauan%20Umum.pdf document_url: https://repository.itny.ac.id/id/eprint/5307/4/4.%20BAB%20III%20-%20Tinjauan%20Pustaka.pdf document_url: https://repository.itny.ac.id/id/eprint/5307/5/5.%20BAB%20IV%20-%20Hasil%20Penelitian.pdf document_url: https://repository.itny.ac.id/id/eprint/5307/6/6.%20BAB%20V%20-%20Pembahasan.pdf document_url: https://repository.itny.ac.id/id/eprint/5307/7/7.%20BAB%20VI%20-%20Penutup.pdf document_url: https://repository.itny.ac.id/id/eprint/5307/8/710018211_Andrean%20Yogatama%20A%20W_Jurnal%20Ilmiah.pdf document_url: https://repository.itny.ac.id/id/eprint/5307/9/8.%20DAFTAR%20PUSTAKA.pdf document_url: https://repository.itny.ac.id/id/eprint/5307/10/9.%20LAMPIRAN.pdf