eprintid: 5299 rev_number: 18 eprint_status: archive userid: 343 dir: disk0/00/00/52/99 datestamp: 2024-10-09 03:59:38 lastmod: 2024-10-09 03:59:38 status_changed: 2024-10-09 03:59:38 type: thesis metadata_visibility: show creators_name: WIBOWO, DADI FATHONI contributors_type: http://www.loc.gov/loc.terms/relators/THS contributors_type: http://www.loc.gov/loc.terms/relators/THS contributors_name: Isjudarto, Agustinus contributors_name: Sidiq, Hidayatullah title: Analisis kesesuaian realisasi penambangan menggunakan metode fotogrametri dengan wahana Unmanned Aerial Vehicle (UAV) terhadap desain tambang di PIT 3 Timur Banko periode bulan juli 2022 PT Bukit Asam TBK Provinsi Sumatera Selatan ispublished: unpub subjects: TN divisions: teknik_pertambangan keywords: Undercut, Overcut, Fotogrametri, UAV (Unmanned Aerial Vehicle) = Undercut, Overcut, Fotogrametri, UAV (Unmanned Aerial Vehicle) abstract: PT Bukit Asam Tbk is one of the state-owned enterprises (BUMN) engaged in coal mining located in Lawang Kidul District, Muara Enim Regency, South Sumatra Province. Currently PT Bukit Asam (Persero) Tbk, conducts mining in four locations, namely at the Air Laya Mine (TAL), Muara Tiga Besar (MTB), TSBC and Banko, and for the research location is in PIT 3 East Banko Barat is a self-managed mine that experiences a mismatch between realization and planned design so that analysis is carried out through geospatial information using photogrammetry methods with RTK type unmanned aerial vehicle vehicles. The purpose of this research is to see the level of conformity of mining realization between the mining plan design and the realization or actual mining using the photogrammetric method with the RTK (Real Time Kinematic) type UAV (Unmanned Aerial Vehicle) vehicle. From the field analysis, it is known that the measurement of the research area is 50.04 Ha, then the research area is tied to the ground control point (GCP), then processing is carried out so that the GCP error value is obtained at the millimeter (mm) level with RMSExy is 0.005780000 with a CE90 value of 0.00877115 m and the RMSEz value is 0.006285579 with a LE90 value of 0. 010370576 m, so the data is considered detailed and accurate enough so that it is known that the unloaded volume is 1,298,281.33 m³ with a percentage of 68% of the plan target of 1,902,000.00 m³, the percentage of undercut volume is 889,106.03 m³ with a percentage of 47% of the material unloading target and the volume of excess excavation or overcut is 285,387.36 m³ with a percentage of 15% exceeding the design plan. 3. Mining accuracy consisting of coal getting and overburden removal experienced unachievement against the planned target with a coal getting achievement percentage of 79.06% with a volume of 142,303 m³ from a plan of 180,000 m³ and an overburden removal percentage of 67.13% with a demolition volume of 1,155,978.33 m³ from a target of 1,722,000 m³ = PT Bukit Asam Tbk merupakan salah satu badan usaha milik negara (BUMN) yang bergerak dibidang pertambangan batubara yang terletak di Kecamatan Lawang Kidul, Kabupaten Muara Enim, Provinsi Sumatera Selatan. Saat ini PT. Bukit Asam (persero) Tbk, melakukan penambangan di empat lokasi yaitu di Tambang Air Laya (TAL), Muara Tiga Besar (MTB), TSBC dan Banko, dan untuk lokasi penelitian berada di PIT 3 Timur Banko Barat merupakan tambang swakelola yang mengalami ketidaksesuaian antara realisasi terhadap desain yang direncanakan sehingga dilakukan analisis melalui informasi geospasial menggunakan metode fotogrametri dengan wahana unmanned aerial vehicle tipe RTK . Untuk parameter dalam pengambilan data penelitian Skripsi ini menggunakan pengaturan tinggi terbang 170 m dari titik take off dan pengaturan Overlap 75% dan Sidelap 65% serta terbangi menjadi 3 jalur terbang dengan pertimbangan jarak dan luas cakupan area.Tujuan dari penelitian ini adalah untuk melihat tingkat kesesuaian realisasi penambangan antara desain rencana penambangan terhadap realisasi atau aktual penambangan menggunakan metode fotogrametri dengan wahana UAV (Unmanned Aerial Vehicle) tipe RTK (Real Time Kinematic). Dari analisis dilapangan diketahui pengukuran luasan area penelitian seluas 50,04 Ha kemudian area penelitian di ikat dengan titik control tanah (GCP) selanjutnya dilakukan pengolahan sehingga didapatkan nilai error GCP didapatkan pada tingkat milimeter (mm) Dengan RMSExy adalah 0.005780000 dengan nilai CE90 0.00877115 m dan nilai RMSEz adalah 0.006285579 dengan nilai LE90 0.010370576 m, dengan begitu data dinilai detail dan cukup akurat sehingga diketahui volume terbongkar sebesar 1.298.281.33 m³ dengan presentase 68% dari target rencana sebesar 1.902.000.00 m³, presentase volume undercut sebesar 889.106,03 m³ dengan presentase 47% dari target pembongkaran material dan volume kelebihan penggalian atau overcut sebesar 285.387.36 m³ dengan presentase 15% melebihi desain rencana. 3. Akurasi penambangan yang terdiri dari coal getting dan overburden removal mengalami ketidak tercapaian terhadap target yang direncanakan dengan presentase ketercapaian coal getting sebesar 79,06% dengan volume sebesar 142.303 m³ dari rencana sebesar 180.000 m³ dan presentase overburden removal sebesar 67,13% dengan volume hasil pembongkaran sebesar 1.155.978,33 m³ dari target sebesar 1.722.000 m³. date: 2023-06-13 date_type: completed full_text_status: restricted institution: Institut Teknologi Nasional Yogyakarta department: Fakultas Teknik dan Perencanaan : Teknik Pertambangan thesis_type: other thesis_name: other referencetext: Budi, E. & Suyudi, B. (2017). Fotogrametri Terapan. Yogyakarta : STPN. Elliot, M.A. dan YOHE, G.R. (1981) : The Coal Industry and Coal Research and Development in Prospective, dalam H.H. LOWRY, Chemistry of Coal Utilization – Second Suplementary Volume, John Willey and Sons, New York, N.Y.USA. Fajar, T., Prasetyo, Y., Hani`ah. (2016). Analisis Deformasi Dan Volumetrik Menggunakan Metode Pengamatan 3 Dimensi Unmanned Aerial Vehicle (Uav). Jurnal Geodesi UNDIP. Universitas Diponegoro. Indonesianto, Y & Sidiq, H. (2020). Buku Ajar Perencanaan Tambang Terbuka. Yogyakarta : Teknik Pertambangan ITNY. Kubik, D.L. and Greenwood, J.A. (2006). Development of Photogrammetry of Stress Analysis and Quality Control. Paine., David P., (1993). Fotografi Udara dan Penafsiran Citra Untuk Pengelolaan Sumberdaya Edisi ke-2. Yogyakarta: Gadjah Mada University Press. Terjemahan Imam Abdurahman. Buku Asli : Aerial Photography and Image Interpretation For Resource Managament, John Wiley & Sons. Purwadhi, S. H. (2001) ‘Interpretasi Citra Digital’, Jakarta: Grasindo. Putra, A. (2009) ‘Makalah : Penginderaan Jauh Jillid 1-Cetakan 2 Tahun 1992 Prof. Dr. Sutanto’. Rokhmana, C. A. (2015), Juli. Potensi Pemanfaatan Penginderaan Jauh Dengan Wahana Udara Nir-Awak Di Industri Tambang Dan Migas. In Seminar Nasional Informatika (SEMNASIF) (Vol. 1, No. 5). Setiawan, T. F., & Prasetyo, Y. (2016). Analisis Deformasi Dan Volumetrik Menggunakan Metode Pengamatan 3 Dimensi Unmanned Aerial Vehicle (Uav)(Studi Kasus: Brown Canyon, Semarang). Jurnal Geodesi Undip, 5(4), 82-90. Jhony., Firdaus, W. "Pemanfaatan Drone Untuk Monitoring Akurasi Perencanaan Tambang Batubara Terbuka." Prosiding Temu Profesi Tahunan PERHAPI 1.1 (2019): 181-190. Hadari Nawawi, H. Strynatka, R. (2007). Photogrammetric Workflows: Traditional, Digital and the Future. Ibrahim, E. (2015). Rekonsiliasi Penambangan Antara Rencana Penambangan Bulanan dengan Realisasi di Tambang Swakelola B2 PT. Bukit Asam (Persero), Tbk. Jurnal Ilmu Teknik, 3(1). Setiawan, T. F., & Prasetyo, Y. (2016). “Analisis Deformasi dan Volumetrik Menggunakan Metode Pengamatan 3 Dimensi Unmanned Aerial Vehicle 93 (UAV)(Studi Kasus: Brown Canyon, Semarang)”. Jurnal Geodesi UNDIP, 5(4), 82-90. Badan Informasi Geospasial, (2014). Peraturan Kepala Badan Informasi Geospasial No.15 Tahun 2014 tentang Pedoman Teknis Ketelitian Peta Dasar. Berteska, T., Ruzgiene, B. (2013). Photogrammetric mapping based on UAV imagery. Geodesy and Cartography, Vol. 39, Issue 4, 158-163. Eisenbeiss, H. 2009. “UAV Photogrammetry”. Zurich:Institut für Geodäsie und Photogrammetrie. Eisenbeiss, H. (2009). “UAV Photogrammetry”. Zurich:Institut für Geodäsie und Photogrammetrie. Soeta’at. (1994). Diktat Fotogrametri Analitik. Jurusan Teknik Geodesi Fakultas Teknik Universitas Gadjah Mada. Yogyakarta. Website Image Helicopcter. (2020). https://www.id.pinterest.com/id (diakses tanggal 20 Juli 2022). Website official produk drone DJI. (2021). https://www.dji.com/id (diakses tanggal 20 Juli 2022). Website PT Bukit Asam Tbk. (2022). https://www.ptba.co.id/ (diakses tanggal 20 Juli 2022). Webstite Halorobotic. (2019). https://halorobotics.com/ (diakses tanggal 5 Agustus 2022). citation: WIBOWO, DADI FATHONI (2023) Analisis kesesuaian realisasi penambangan menggunakan metode fotogrametri dengan wahana Unmanned Aerial Vehicle (UAV) terhadap desain tambang di PIT 3 Timur Banko periode bulan juli 2022 PT Bukit Asam TBK Provinsi Sumatera Selatan. Other thesis, Institut Teknologi Nasional Yogyakarta. document_url: https://repository.itny.ac.id/id/eprint/5299/1/COVER_merged%20%285%29.pdf document_url: https://repository.itny.ac.id/id/eprint/5299/2/BAB%20I%20PENDAHULUAN.pdf document_url: https://repository.itny.ac.id/id/eprint/5299/3/BAB%20II%20TINJAUAN%20UMUM.pdf document_url: https://repository.itny.ac.id/id/eprint/5299/4/BAB%20III%20DASAR%20TEORI.pdf document_url: https://repository.itny.ac.id/id/eprint/5299/5/BAB%20IV%20HASIL%20PENELITIAN.pdf document_url: https://repository.itny.ac.id/id/eprint/5299/6/BAB%20V%20PEMBAHASAN.pdf document_url: https://repository.itny.ac.id/id/eprint/5299/7/BAB%20VI%20KESIMPULAN.pdf document_url: https://repository.itny.ac.id/id/eprint/5299/8/DRAFT%20SKRIPSI%20DADI%20FATHONI%20WIBOWO%20710018057.pdf document_url: https://repository.itny.ac.id/id/eprint/5299/9/JURNAL%20DADI%20FATHONI%20WIBOWO.pdf document_url: https://repository.itny.ac.id/id/eprint/5299/10/DAFTAR%20PUSTAKA.pdf document_url: https://repository.itny.ac.id/id/eprint/5299/11/LAMPIRAN_merged%20%281%29.pdf