eprintid: 5205 rev_number: 17 eprint_status: archive userid: 343 dir: disk0/00/00/52/05 datestamp: 2024-11-26 02:52:39 lastmod: 2024-11-26 02:52:39 status_changed: 2024-11-26 02:52:39 type: thesis metadata_visibility: show creators_name: HARIS, AFDIL contributors_type: http://www.loc.gov/loc.terms/relators/THS contributors_type: http://www.loc.gov/loc.terms/relators/THS contributors_name: Isjudarto, Agustinus contributors_name: Putra, Bayurohman Pangacella title: Optimalisasi kinerja alat gali muat dan alat angkut coal getting di PT.Budi Gema Gempita, kabupaten Lahat, provinsi Sumatera Selatan ispublished: unpub subjects: TN divisions: teknik_pertambangan keywords: Coal, Dump Truck Hino 500 FM 260JD, Efficiency, Excavator Hitachi Zaxis 350, Productivity, Work = Batubara, Produktivitas, Efisiensi Kerja, Excavator Hitachi Zaxis 350, Dump Truck Hino 500 FM 260JD abstract: PT. Budi Gema Gempita (BGG) is one of the coal mining companies operating in East Merapi District, Lahat Regency, South Sumatra Province. The mining process in the company has not reached the desired target, especially in October 2021, where in 2021 the target set by the company is 1.155.159 tons / year. Meanwhile, for October 2021, it was 117.969 tons/month and for production reached in October, it was 63.392 tons. The productivity of digging and loading equipment is 1 unit of Excavator Hitachi Zaxis 350 with a bucket capacity of 2,2 m3 which is 172,80 tons / hour, and the available working time is 8,53 hours / shift with work efficiency of 87%. Then the productivity of transportation equipment, namely 12 units of Hino 500 FM 260JD is 328,45 tons / hour, and the available working time is 7,73 hours / shift with a work efficiency of 78%. The compatibility of the tool between the digging and loading equipment and the conveyance is 2,54 or MF>1. The problem contained in this study is the non-achievement of the set production target, this result is caused by several factors that affect the work efficiency of mechanical devices, such as workplace conditions, weather conditions, human factors, and time delays. The purpose of this study is to analyze obstacle factors that affect tool performance, find out the actual productivity of loading and hauling equipment, improve and optimize equipment performance so that production targets can be achieved. After repair, the productivity of digging equipment loading 2 unit of hitachi zaxis 350 excavator was obtained at 403,37 tons / hour and work efficiency was 92%, the productivity of 12 units of Hino 500 FM 260JD is obtained 428,46 tons / hour and work efficiency wa 88% = PT. Budi Gema Gempita (BGG) merupakan salah satu perusahaan tambang batubara yang beroperasi di Kecamatan Merapi Timur, Kabupaten Lahat, Provinsi Sumatera Selatan. Proses Penambangan di perusahaan belum mencapai target yang diinginkan terkhusus pada bulan oktober tahun 2021, dimana pada tahun 2021 target yang ditetapkan oleh perusahaan yaitu 1.155.159 ton/tahun. Sedangkan untuk bulan oktober 2021 yaitu 117.969 ton/bulan dan untuk produksi yang tercapai dibulan oktober adalah 63.392 ton. Produktivitas alat gali-muat yaitu 1 unit Excavator Hitachi Zaxis 350 dengan kapasitas bucket 2,2 m3 yaitu 172,80 ton/jam, dan waktu kerja tersedia adalah 8,53 jam/shift dengan efisiensi kerja yaitu 87%. Kemudian produktivitas alat angkut yaitu 12 unit Hino 500 FM 260JD adalah 328,45 ton/jam, dan waktu kerja tersedia 7,73 jam/shift dengan efisiensi kerja yaitu 78%. Keserasian alat antara alat gali-muat dan alat angkut adalah 2,54 atau MF>1. Masalah yang terdapat pada penelitian ini adalah tidak tercapainya target produksi yang ditetapkan, hasil ini disebabkan oleh beberapa faktor yang mempengaruhi efisiensi kerja alat mekanis seperti kondisi tempat kerja, kondisi cuaca, faktor manusia, dan waktu tunda. Tujuan penelitian ini adalah untuk menganalisis faktor hambatan yang mempengaruhi kinerja alat, mengetahui produktivitas aktual alat gali-muat dan alat angkut, meningkatkan dan mengoptimalkan kinerja alat agar target produksi bisa tercapai. Setelah perbaikan, produktivitas alat gali-muat 2 unit excavator hiachi zaxis 350 didapat 430,37 ton/jam dan efisiensi kerja yaitu 92% produktivitas alat angkut 12 unit Hino 500 FM 260JD didapat 428,46 ton/jam dan efisiensi kerja yaitu 88% . date: 2024-07-18 date_type: completed official_url: https://www.repository.itny.ac.id full_text_status: restricted institution: Institut Teknologi Nasional Yogyakarta department: Fakultas Teknik dan Perencanaan : Teknik Pertambangan thesis_type: other thesis_name: other referencetext: Bandaso, Surya. Winarmo, Agus. Hasan, Harjuni. Litha, R, Lucia. Maghdalena Henny. 2023, Studi Kehilangan Batubara Dari Stockpile Ke Tongkang Di PT. Indochin Resources Kecamatan Palaran, Samarinda, Provinsi Kalimantan Timur Basuki, E. P, 2023, Proses Terbentuknya Batu Bara, Jenis-jenis, dan Manfaatnya. Budi Gema Gempita, PT. Data Laporan dan Arsip (2021), Kecamatan Merapi Timur, Kabupaten Lahat, Sumatera Selatan Chironis., Nicholas P. 1978. Coal Age Operating Handbook of Coal Surface Mining and Reclamation. Mc Graw-Hill, Inc:New York. Hakim, I. 2020, Batu Bara: Pengertian, Jenis, Dan Proses Terbentuknya. Hartman,1992, Faktor Keseralasan Kerja Antara Alat Gali-Muat dan Alat Angkut Hino 500 Ranger, Truck FM 260 JD. (2019). Handbook of Hino Truck,. PT. Hino Motors Indonesia Indonesianto, Y. (2019) Pemindahan Tanah Mekanis, Teknik Pertambangan, FT Mineral. Univ. Pembangunan Nasional “Veteran” Yogyakarta. Yoyakarta. Irvandy, Afif. Triantoro, Agus. Melati, Sari. 2019, Analisis Coal Losses Pada Kegiatan Penambangan di Pit Inul Middle Panel 3 PT. Kaltim Prima Coal Kanz, Zaky, F. Anarta, Rudy. 2022, Analisa Tingkat Kehilangan Batubara (Coal Losses) Dari Proses Coal Getting Sampai Barging Di PT. Bhumi Sriwijaya Perdana Coal, Kecamatan Tungkul Jaya, Kabupaten Musi Banyuasin, Provinsi Sumatera Selatan Kulu, S. L. (2018). Optimalisasi Alat Gali Muat Untuk Mencapai Target Produksi Batubara PT. Kaltim Diamond Coal, Kabupaten Kutai Kartanegara, Provinsi Kalimantan Timur. Jurnal Teknologi Mineral FT UNMUL, 6(2), 43-46. Kurniawan Z. (2019). Kajian Teknis Alat Gali Muat dan Alat Angkut Untuk Mencapai Target Produksi Pada Penambangan Bauksit di PT. Dinamika 48 Sejahtera Mandiri, Kabupaten Sanggau, Provinsi Kalimantan Barat. (Doctoral dissertation, Universitas Pembangunan Nasional Veteran Yogyakarta). Pfleider, E.P., 1968, Surface Mining, 1st Edition, The American Institute of Mining, Metallurgical & Petroleum Engineering Inc., New York. Prasmoro, A. V. (2014). Optimasi Produksi Dump Truck Volvo Fm 440 Dengan Metode Kapasitas Produksi Dan Teori Antrian Di Lokasi Pertambangan Batubara. Jurnal Oe, 6(1), 98. Prodjosumanto, P., (1989) Tambang Terbuka Institut Teknologi Bandung Prodjosumarto, P., 1993, Pemindahan Tanah Mekanis, Jurusan Teknik Pertambangan, Institut Teknologi Bandung (ITB). Prodjosumarto, P., 1995, Pemindahan Tanah Mekanis, Institut Teknologi Bandung, ITB, Bandung. Rochmanhadi.1989, Alat Alat Berat dan Penggunaannya, Cetakan III, Badan Penerbitan Pekerjaan Umum. Saputra, AR. Ningsi, YB. Suwardi, FR. 2021, Coal Losses Pada Kegiatan Penambangan Batubara Di PT. X, Sumatera Selatan. Sari, M. 2020, Asal Muasal Terbentuk Batubara. Stach, 1982, op cit Susilawati 1992, Pembentukan Batubara. Suwarna. N (1995). Peta Geologi Lembar Lahat 1:250.000, Sumatera Selatan. Pusat Penelitian dan Pengembangan Geologi Bandung Triono & Islamiah, D. 2014, Perhitungan Kemajuan Tambang (Progress Mining) Dengan Metode Penampang Melintang di Cv. Wulu Bumi Sakti Kecamatan Samboja Kabupaten Kutai Kartanegara Propinsi Kalimantan Timur. Zuhriansyah. 2018, Optimalisasi Produksi Pada Penambangan Batubara di PT. Natural Artha Resources Simpang Niam. citation: HARIS, AFDIL (2024) Optimalisasi kinerja alat gali muat dan alat angkut coal getting di PT.Budi Gema Gempita, kabupaten Lahat, provinsi Sumatera Selatan. Other thesis, Institut Teknologi Nasional Yogyakarta. document_url: https://repository.itny.ac.id/id/eprint/5205/1/Cover%20Skripsi.pdf document_url: https://repository.itny.ac.id/id/eprint/5205/2/BAB.%20I.pdf document_url: https://repository.itny.ac.id/id/eprint/5205/3/BAB.%20II.pdf document_url: https://repository.itny.ac.id/id/eprint/5205/4/BAB.%20III.pdf document_url: https://repository.itny.ac.id/id/eprint/5205/5/BAB.%20IV.pdf document_url: https://repository.itny.ac.id/id/eprint/5205/6/BAB.%20V.pdf document_url: https://repository.itny.ac.id/id/eprint/5205/7/BAB.%20VI.pdf document_url: https://repository.itny.ac.id/id/eprint/5205/8/OPTIMALISASI%20KINERJA%20ALAT%20GALI%20MUAT%20DAN%20ALAT%20ANGKUT%20COAL%20GETTING%20DI%20PT.%20BUDI%20GEMA%20GEMPITA%2C%20KABUPATEN%20L.pdf document_url: https://repository.itny.ac.id/id/eprint/5205/9/Daftar%20Pustaka.pdf document_url: https://repository.itny.ac.id/id/eprint/5205/10/Lampiran.pdf