eprintid: 4508 rev_number: 16 eprint_status: archive userid: 308 dir: disk0/00/00/45/08 datestamp: 2024-06-14 02:37:37 lastmod: 2024-06-14 02:37:37 status_changed: 2024-06-14 02:37:37 type: thesis metadata_visibility: show creators_name: ROMKENY, VRONSKY contributors_type: http://www.loc.gov/loc.terms/relators/THS contributors_type: http://www.loc.gov/loc.terms/relators/THS contributors_name: Isjudarto, Agustinus contributors_name: Mukarrom, Faisol corp_creators: Teknik Pertambangan title: Evaluasi produktivitas alat gali muat dan alat angkut pada penambangan tanah penutup di elevasi RL 390 PT. Batutua Kharisma Permai Kabupaten Maluku Barat Daya Provinsi Maluku ispublished: unpub subjects: TN divisions: sch_ecs keywords: Produktivitas, Cycle Time, Match Factor abstract: PT.Batutua Kharisma Permai dalam rangka melakukan kegiatan penambangan menggunakan sistem penambangan terbuka (Surface Mining) dengan metode open pit. PT.Batutua Kharisma Permai menetapkan target produksi pengupasan tanah penutup sebesar 125.000 BCM/bulan. Tetapi pada kenyataannya realisasi produksi pada bulan September 2021 yang dihasilkan sebesar 77.870,149 BCM/bulan. Produksi pada saat dilakukan penelitian belum memenuhi target yang diinginkan. Dalam proses penelitian ini dilakukan dengan mengamati satu front penambangan di Pit Partolang pada elevasi RL 390, dengan kombinasi 1 unit alat gali muat Excavator Caterpillar 6015B dengan cycle time 2,88 menit dan 5 unit alat angkut HT Caterpillar 773E, dengan cycle time 18,43 menit. Kombinasi kedua alat tersebut memiliki nilai match factor 0,78 dengan efisiensi kerja alat gali muat sebesar 58,6% dan alat angkut 72,7% . Faktor-faktor penyebab tidak tercapainya target produksi adalah rendahnya efisiensi kerja alat gali muat dan alat angkut, serta tingginya cycle time dari rangkaian kerja alat gali muat dan alat angkut pada saat beroperasi serta kombinasi antara alat gali muat dan alat angkut. Upaya yang dilakukan agar dapat memenuhi target produksi adalah meningkatkan waktu kerja efektif dan meminimalisir hambatan yang dapat dihindari, pelebaran dalam area loading point sehingga mengurangi waktu edar alat mekanis. Dari beberapa upaya yang dilakukan dalam rangka meningkatkan produksi alat mekanis, menghasilkan MF sebesar 0,91 dengan efisiensi kerja alat gali muat sebesar 65,2% dan alat angkut sebesar 76,7%. Hasil rekomendasi dari perbaikan yang telah dilakukan terhadap kedua mekanis tersebut, menghasilkan produksi sebesar 125.876,090 BCM/bulan. Sehingga dari rekomendasi perbaikan yang telah dilakukan, target produksi pengupasan tanah penutup sebesar 125.000 BCM/bulan di PT.Batutua Kharisma Permai telah tercapai. Kata Kunci: Produktivitas, Cycle Time, Match Factor date: 2024-01-11 date_type: submitted full_text_status: restricted institution: Institut Teknologi Nasional Yogyakarta department: Fakultas Teknik : Teknik Pertambangan thesis_type: other thesis_name: other referencetext: Boulter, G. 1972. Cyclical Methods – Draglines and Clamshells. In: Surface Mining. New York: The American Institute of Mining, Metallurgical. and Petroleum Engineers, Inc. Burt C. dan Caccetta L. 2014. Equipment Selection for Surface Mining, Interfaces. In: Optimization of Load-Haul-Dump Mining System by OEE and Match Factor for Surface Mining. International Journal of Applied Engineering and Technology Caterpillar Performance Handbook, 45th ed. 2015. Peoria, Illinois: Caterpillar Inc. https://wagnerequipment.com/caterpillar-performance-handbook-no-45/ Hartman, H. L. 1987. Introductory Mining Engineering. New York: John Wiley and Sons, Inc. Hustrulid, W. dan Kuchta.M.2013. Open Pit Mine and Design, Vol 1: Fundamentals. Rotterdam: A.A. Balkema. Keputusan Menteri Energi Dan Sumber Daya Mineral Republik Indonesia (KEPMEN ESDM) No. 1827 Tahun 2018 tentang Pedoman Pelaksanaan Kaidah Pertambangan Yang Baik. Jakarta. Nakajima, S. 1988. Introduction to TPM – total productive maintenance. Productivity Press, Cambridge Nichols, H.L. dan Day,D.A.2005. Moving the Earth – The Workbook of Excavation, 4th ed. New York: McGraw-Hill. Peurifoy dan Robert L. 2006. Construction Planning, Equipment, and Methods, 7th ed. New York: McGraw-Hill Prodjosumarto,P.2006, Pemindahan Tanah Mekanis, Jurusan Teknik Pertambangan, Institut Teknologi Bandung, Bandung. PT.Batutua Kharisma Permai 2021, Data curah hujan, Litologi dan, geologi regional pulau wetar, Rumfelt, H. 1972. Cyclical Methods – Shovel and Backhoes. In: Surface Mining. New York: The American Institute of Mining, Metallurgical. And Petroleum Engineers, Inc. Sulistyana,W. 2015. Perencanaan Tambang. Yogyakarta: ProdiTeknik Pertambangan, UPN “V” Yogyakarta. Tannant, D. D. danRegensburg, B. 2001. Guidelines for Mine Haul Road Design. Kelowna: School of Engineering University of British Columbi Yanto, Indonesianto, 2019, Pemindahan Tanah Mekanis, Program Studi Teknik Pertambangan, UPN “Veteran” Yogyakarta citation: ROMKENY, VRONSKY (2024) Evaluasi produktivitas alat gali muat dan alat angkut pada penambangan tanah penutup di elevasi RL 390 PT. Batutua Kharisma Permai Kabupaten Maluku Barat Daya Provinsi Maluku. Other thesis, Institut Teknologi Nasional Yogyakarta. document_url: https://repository.itny.ac.id/id/eprint/4508/1/COVER%20DAN%20PENDAHULUAN.pdf document_url: https://repository.itny.ac.id/id/eprint/4508/2/BAB%20I.pdf document_url: https://repository.itny.ac.id/id/eprint/4508/3/BAB%20II.pdf document_url: https://repository.itny.ac.id/id/eprint/4508/4/BAB%20III.pdf document_url: https://repository.itny.ac.id/id/eprint/4508/5/BAB%20IV.pdf document_url: https://repository.itny.ac.id/id/eprint/4508/6/BAB%20V.pdf document_url: https://repository.itny.ac.id/id/eprint/4508/7/BAB%20VI.pdf document_url: https://repository.itny.ac.id/id/eprint/4508/8/DAFTAR%20PUSTAKA.pdf document_url: https://repository.itny.ac.id/id/eprint/4508/9/LAMPIRAN.pdf