%0 Generic %A Ohoiwirin 710017198, Paustinus %C Yogyakarta %D 2023 %F ITNYREPOID:4225 %I ITNY %K Kata kunci : Daerah tangkapan hujan, air limpasan, kolam pengendapan %T Evaluasi settling pond di imkasu pt. gag nikel, Pulau Gag, kecamatan waigeo barat kepulauan, Kabupaten Raja Ampat, Provinsi Papua Barat %U https://repository.itny.ac.id/id/eprint/4225/ %X SARI Curah hujan tinggi di tambang PT Gag Nikel menyebabkan air meluap dari kolam pengendapan di Imkasu, merembes ke Settling pond, dan tumpah ke jalan hauling. Perusahaan menggunakan data debit limpasan (2.73 m3/detik), koefisien limpasan (0.6), luasan daerah tangkapan hujan (0.108 km2), dan intensitas curah hujan (151.349 mm/jam) untuk mengelola air dan mencegah dampak negatif. Tingginya persentase TSS pada kompartemen Settling pond mengindikasikan kemungkinan akumulasi padatan atau residu tersuspensi dengan variasi TSS antara 0.000118% hingga 0.002824% di setiap kompartemen. Evaluasi pengendapan dan pengelolaan padatan perlu dilakukan, termasuk penyesuaian dimensi dan kapasitas Settling pond, serta pengaturan debit air masuk. Kecepatan pengendapan di semua kompartemen (Kompartemen 1, 2, 3, 4, dan 5) adalah 0.00194 m/detik, dengan waktu partikel mengendap sekitar 34.40 menit. Kecepatan air bervariasi di setiap kompartemen mulai dari 0.04 m/detik sampai 0.06 m/detik. Material lumpur membutuhkan waktu sekitar 13.17-6.06 menit untuk keluar. Persentase pengendapan yang berhasil dicapai pada semua kompartemen adalah sebesar 27.68%-14.96%. Geometri saluran terbuka direkomendasikan dengan kemiringan dinding saluran (α): 60°, kedalaman air (h): 1.16 m, kedalaman saluran (d): 1.34 m, lebar dasar saluran (B): 1.16 m, lebar permukaan (b): 2.52 m, luas penampang basah saluran (A): 2.35 m, dan panjang dinding saluran (a): 1.56 m. Setiap kompartemen kolam pengendapan memiliki dimensi yang berbeda. Kompartemen 1 memiliki kedalaman (H) = 4 m, lebar (b) = 40.00 m, dan panjang (l) = 35.00 m, dengan luas area 11045.98 m². Dilengkapi dengan penyekat berukuran lebar 4 m, panjang 34.00 m, dan kedalaman 4 m. Kompartemen 2 memiliki kedalaman (H) = 4 m, lebar (b) = 37.00 m, dan panjang (l) = 32.00 m, dengan luas area 1407 m². Juga dilengkapi dengan penyekat berukuran lebar 4 m, panjang 31.00 m, dan kedalaman 4 m. Kompartemen 3 memiliki kedalaman (H) = 4 m, lebar (b) = 34.00 m, dan panjang (l) = 29.00 m, dengan luas area 1407 m². Juga dilengkapi dengan penyekat berukuran lebar 4 m, panjang 28.00 m, dan kedalaman 4 m. Kompartemen 4 memiliki kedalaman (H) = 4 m, lebar (b) = 31.00 m, dan panjang (l) = 26.00 m, dengan luas area 1407 m². Memiliki penyekat berukuran lebar 4 m, panjang 25.00 m, dan kedalaman 4 m. Kompartemen 5 memiliki kedalaman (H) = 4 m, lebar (b) = 28.00 m, dan panjang (l) = 23.00 m, dengan luas area 1407 m². Dengan penyekat berukuran lebar 4 m, panjang 22.00 m, dan kedalaman 4 m. Panjang total kolam 145 meter, luas keseluruhan 160-112 meter2, dan volume 5800- 2576 meter3. Durasi pemeliharaan: Kompartemen 1 (30 hari), Kompartemen 2 (82 hari), Kompartemen 3 (122 hari), Kompartemen 4 (322 hari), dan Kompartemen 5 (621 hari). Kata kunci : Daerah tangkapan hujan, air limpasan, kolam pengendapan ABSTRACT High rainfall at PT Gag Nikel mine has caused water overflow from the settling pond in Imkasu, seeping into the Settling pond, and spilling onto the hauling road. To manage water and prevent negative impacts, the company utilizes data on runoff discharge (2.73 m3/second), runoff coefficient (0.6), catchment area (0.108 km2), and rainfall intensity (151.349 mm/hour). The high TSS (Total Suspended Solids) percentage in the Settling pond compartments indicates possible accumulation of suspended solids or residues, with TSS variation ranging from 0.000118% to 0.002824% in each compartment. An evaluation of sedimentation and sediment management is required, including adjusting the dimensions and capacity of the Settling pond and regulating the inflow rate. The settling velocity in all compartments (Kompartemen 1, 2, 3, 4, and 5) is 0.00194 m/second, with a particle settling time of approximately 34.40 minutes. Water velocity varies in each compartment, ranging from 0.04 m/second to 0.06 m/second. The sediment material takes around 13.17-6.06 minutes to discharge. The achieved sedimentation percentage in all compartments ranges from 27.68% to 14.96%. Recommended open channel geometry includes a channel wall slope (α) of 60°, water depth (h) of 1.16 m, channel depth (d) of 1.34 m, channel base width (B) of 1.16 m, surface width (b) of 2.52 m, cross-sectional area of the channel (A) of 2.35 m, and wall length (a) of 1.56 m. Each compartment of the sedimentation pond has different dimensions. Kompartemen 1 has a depth (H) of 4 m, width (b) of 40.00 m, and length (l) of 35.00 m, with an area of 11045.98 m². It is equipped with a 4 m wide, 34.00 m long, and 4 m deep partition. Kompartemen 2 has a depth (H) of 4 m, width (b) of 37.00 m, and length (l) of 32.00 m, with an area of 1407 m². It is also equipped with a 4 m wide, 31.00 m long, and 4 m deep partition. Kompartemen 3 has a depth (H) of 4 m, width (b) of 34.00 m, and length (l) of 29.00 m, with an area of 1407 m². It is also equipped with a 4 m wide, 28.00 m long, and 4 m deep partition. Kompartemen 4 has a depth (H) of 4 m, width (b) of 31.00 m, and length (l) of 26.00 m, with an area of 1407 m². It has a 4 m wide, 25.00 m long, and 4 m deep partition. Kompartemen 5 has a depth (H) of 4 m, width (b) of 28.00 m, and length (l) of 23.00 m, with an area of 1407 m². It is equipped with a 4 m wide, 22.00 m long, and 4 m deep partition. The total length of the pond is 145 meters, with an overall area of 160112 m² and a volume of 5800-2576 m³. The maintenance durations are as follows: Kompartemen 1 (30 days), Kompartemen 2 (82 days), Kompartemen 3 (122 days), Kompartemen 4 (322 days), and Kompartemen 5 (621 days).